Sub topic 2
Capture a baseline before changing the workflow
This chapter assumes you have already written down your goals (the previous chapter) and that you know everyday marketing work: briefs, drafts, review rounds, and publishing. It also assumes you can compute an average and a percentage in a spreadsheet. By the end, you will be able to capture a baseline for time and quality that later chapters can compare against.
What a baseline is and why it comes first
A baseline is a record of how your team performs on a task before AI changes the workflow. It gives you a "before" number. Without it, any claim such as "AI cut our email drafting time in half" rests on memory, and memory is unreliable. People tend to remember the worst projects, and they tend to overestimate the effort of the old way once a new tool feels easier.
A baseline serves three purposes:
- It turns your goals into numbers you can check. If your goal is "faster first drafts without lower quality," you need a starting speed and a starting quality score.
- It exposes how much natural variation exists. Some tasks take 40 minutes and others take 3 hours, even with no AI involved. You need to know that spread before you can tell a real change from normal noise.
- It protects you from rewriting history. Once the team has used AI for a month, nobody can reliably reconstruct how long things used to take.
The order matters. Capture the baseline before the first AI-assisted task, because every task done with AI after that point is already contaminated for the purpose of a "before" measurement.
Choose which tasks to baseline
You do not need to baseline everything. Pick the task types you plan to change and that match your goals. A good task type has three traits:
- It repeats often enough that you can collect a useful sample.
- It has a clear start and a clear finish.
- It produces an output you can score for quality.
Common examples include blog post first drafts, email subject lines and body copy, ad variations, social post batches, and product description updates. Weak candidates are one-off strategy documents and tasks with no stable definition of "done."
For each task type, write a short definition that fixes the boundaries. The definition should say what counts as the start (for example, "brief approved") and what counts as the finish (for example, "draft passes editor review and is ready to schedule"). If two people define the boundaries differently, their times are not comparable.
| Task type | Start | Finish | Output scored |
|---|---|---|---|
| Newsletter issue | Brief approved | Editor signs off | Final copy |
| Ad copy set (5 variants) | Brief approved | Variants uploaded to the ad platform | Variants as uploaded |
| Product description | Product facts supplied | Description approved by the product owner | Approved text |
What to measure in the baseline
A baseline for a marketing workflow covers two areas, time and quality. A third area, outcomes, is covered in a later chapter, but you can start collecting it now if the data already exists.
Time
Record the total time from start to finish, then break it into stages. The stages matter because AI usually changes some stages and leaves others alone. If you only record a single total, you cannot tell where the savings or losses come from.
A typical breakdown looks like this:
- Research and gathering inputs
- Outlining or planning
- First draft
- Internal review and edits
- Revisions after feedback
- Final formatting and publishing
Record working time, meaning the minutes someone actively spent, separately from elapsed time, meaning the calendar time from start to finish. A blog post may need only 3 working hours but sit in an approval queue for 4 days. AI can reduce working time without touching elapsed time, and your stakeholders may care about either one. Decide which one your goal refers to, and record both if you can.
Quality
Record a quality score for the same outputs. Use the rubric you will use later for AI-assisted work, so the scores are comparable. Chapters on quality dimensions and rubrics cover how to build one. For the baseline, the key point is this: score the old outputs with the same rubric, the same scale, and ideally the same reviewers you will use after AI is introduced.
If you have no rubric yet, build a simple one first. A baseline scored with one scale cannot be compared with later scores from a different scale.
Rework
Count how many revision rounds each piece needed and how many minutes they took. Rework is often the hidden cost of AI-assisted drafts, so you need the human-only rework level to compare against.
Where baseline data comes from
You have two main sources. Each has strengths and limits.
| Source | How it works | Strength | Limit |
|---|---|---|---|
| Historical records | Pull timestamps, ticket durations, and past outputs from project tools | No extra effort, large sample | Timestamps often show elapsed time, not working time. Quality scoring must be done after the fact |
| Prospective tracking | Ask people to log time and save versions as they work for a set period | Accurate working time by stage | Takes effort and can change behavior while people are watched |
Most teams combine the two. Use historical data to see the long-run spread and to pick a realistic sample. Use a short prospective tracking period, commonly 2 to 4 weeks, to capture stage-level working time.
Beware of one common problem with historical data. Records of finished work only contain tasks that were completed. Abandoned tasks, cancelled campaigns, and tasks that were rushed through without logging are missing. This is called survivorship bias, and it can make your baseline look better than reality.
How big should the baseline sample be?
There is no universal number. A practical rule for a team-level baseline is to collect at least 15 to 20 completed tasks per task type, and more if the tasks vary widely. With fewer, one unusual task can move your average a lot.
Check variation before trusting an average. If your baseline times for a task are 45, 50, 48, 52, and 240 minutes, the average of 87 minutes describes none of them. In that case, report the median, which is the middle value when you sort the numbers. Here the median is 50. Also look at what happened with the 240-minute task. It may be an outlier you should explain, or it may point to a distinct type of task that deserves its own baseline.
from statistics import mean, median, stdev
baseline_minutes = [45, 50, 48, 52, 240, 47, 55, 49, 51, 46]
print("count:", len(baseline_minutes))
print("mean:", round(mean(baseline_minutes), 1))
print("median:", median(baseline_minutes))
print("stdev:", round(stdev(baseline_minutes), 1))
# Flag values far above the median for a closer look
threshold = 2 * median(baseline_minutes)
outliers = [m for m in baseline_minutes if m > threshold]
print("outliers:", outliers)Running this prints a mean of 68.3, a median of 49.5, and a standard deviation of about 61.4, and it flags 240 as an outlier. The gap between mean and median is the signal that one value is dominating the average.
Record the baseline in a consistent format
Keep the baseline in a single table with one row per task. A consistent structure makes the later comparison simple. Suggested columns:
- Task ID and task type
- Owner (or a role label if you want to avoid naming individuals)
- Start and finish dates
- Working minutes per stage
- Number of revision rounds
- Quality score and who scored it
- Notes on anything unusual, such as a rush job or a missing brief
The notes column matters more than it seems. A line such as "launch week, three stakeholders added late" explains an outlier and lets you decide whether to keep it.
Plan the baseline period
Run the baseline across a period long enough to include normal ups and downs. A single quiet week may not reflect a month-end campaign push. Likewise, a baseline that sits entirely inside a seasonal peak can overstate how long tasks usually take.
When you decide the baseline is complete, lock it. Save a dated copy of the table and note the date. Do not edit it afterward, even if you later find errors; add a correction note instead. A baseline that changes after you see the AI results invites doubt about your conclusions.
Common errors
- Using estimates instead of records. Asking "how long does a blog post take?" produces a guess. Guesses tend to round to tidy numbers and ignore waiting and rework.
- Mixing task types. Averaging a 30-minute social post with a 4-hour whitepaper outline gives a number that describes neither.
- Measuring only the draft. If AI shortens drafting but review and revision grow, a drafting-only baseline hides the net result.
- Different scoring rules before and after. A new rubric or new reviewers makes the before and after scores incomparable.
- Letting people know the goal too early. If staff know you want to prove AI is faster, they may work slower on the baseline tasks. Explain that you are measuring the process, not judging individuals.
- Skipping the baseline because the data seems obvious. A team that is certain it knows how long a task takes is often wrong by a large margin.
A worked baseline example
A marketing team plans to use AI to draft promotional emails. They define the task as "brief approved to email scheduled in the platform." Over three weeks they log 18 emails and record working minutes by stage, along with a quality score from the same editor using a 1 to 5 rubric.
The summary shows the following:
| Measure | Baseline result |
|---|---|
| Emails logged | 18 |
| Median total working time | 95 minutes |
| Median drafting time | 40 minutes |
| Median review and revision time | 30 minutes |
| Median revision rounds | 2 |
| Mean rubric score | 3.9 of 5 |
| Median elapsed time | 3 days |
Two things stand out. Drafting is only 40 of 95 minutes, so even a large drafting speedup cannot cut total time by more than about 40%. Review and revision take nearly as long as drafting, so any AI-assisted draft that needs more review could erase savings. The baseline has already shaped what to expect and what to watch, and no AI has been used yet.
Summary of the process
- Pick the task types you plan to change.
- Define clear start and finish points for each.
- Choose sources: historical records, short prospective tracking, or both.
- Record working time by stage, revision rounds, and a rubric quality score.
- Collect enough tasks, check spread, and prefer the median when outliers exist.
- Lock a dated copy before the first AI-assisted task.
Exercise
Your team's baseline times for writing a product description are 20, 22, 25, 21, 24, and 150 minutes. The 150-minute task was a new product category that required extra research. Which summary number would you report, what would you do with the 150-minute value, and why does it matter for later comparison?
Show answer
Report the median, which is 23 minutes (the middle of 20, 21, 22, 24, 25 and 150 sorted gives the average of 22 and 24). The mean of about 43.7 minutes is pulled up by one value and describes none of the typical tasks. Do not silently delete the 150-minute task. Keep it in the table with a note explaining the new product category, and consider tracking new-category products as a separate task type. This matters because if AI-assisted tasks are later compared against an inflated mean, the tool will appear to save more time than it really does.
Exercise
A team wants to measure AI's effect on email drafting but has only recorded the total time from brief to scheduled send, with no stage breakdown. Name one risk this creates and one way to fix it before starting the AI trial.
Show answer
The risk is that you cannot see where time changes. If AI shortens drafting but adds review and revision time, the total may show little change and you will not know why. To fix this, run a short prospective tracking period of 2 to 4 weeks in which people log working minutes for each stage (drafting, review, revision, formatting), and record revision rounds. Lock that table as the baseline before any AI-assisted work begins.