Sub topic 1
Why you must check the ruler before you measure the process
Prerequisites
This chapter assumes you know the mean, variance and standard deviation of a data set. You should understand the normal distribution, be able to read a control chart, and know what a specification limit is.
Why measurement needs analysis
Every measurement contains error. A caliper, a scale or an operator's reading can each place a value a little high or a little low. If you measure a process without first checking the measuring system, you cannot tell whether the spread in your data comes from the process or from the gage. A stable process can look unstable, and an unstable process can look stable.
Splitting observed variation into process and measurement parts
Observed variation is the spread of the values you record. It has two sources: real differences between parts, and error from the measurement system. When these sources are independent, their variances add:
σ²observed = σ²part + σ²measurement
The measurement variance splits further into repeatability (the same operator repeating a measurement on the same part) and reproducibility (differences between operators or conditions). Later chapters cover these in detail.
What makes a measurement system good: location and spread
A good measurement system has two qualities. Location describes where the readings sit compared with a reference value. Spread describes how much the readings scatter. Low bias and low spread give readings that are close to the true value and close to each other.
Bias, linearity and stability studies
Bias is the difference between the average reading and a reference value for one part. Linearity is how bias changes across the measuring range. Stability is how bias changes over time, checked by measuring a reference part on a schedule and plotting the results on a control chart.
Worked example: a reference block of 25.00 mm is measured 10 times, and the average is 25.12 mm. The bias is 25.12 − 25.00 = +0.12 mm.
Exercise
A reference part of 50.00 mm is measured 8 times, and the average reading is 49.90 mm. What is the bias, and does the gage read high or low?
Show answer
Bias = 49.90 − 50.00 = −0.10 mm. The gage reads 0.10 mm low.