Sub topic 3
Validating the Current State with the People Who Do the Work
This chapter assumes you know basic flowchart symbols, have a draft swimlane map of one process, and understand cycle time (elapsed time from start to finish for one item) and waiting time (time an item sits idle before a step starts).
Validating the current state with the people who do the work
A map drawn from documents often shows the process as designed, not as it runs. Walk through the draft with the people who do the work. Ask them to point at each box and say whether it matches what they do. Note every step they skip, add, or reorder.
Annotating steps with time, volume and error data
Attach three numbers to each step: processing time, wait time before the step starts, and the share of items that loop back for rework. Use system logs or a sample of 20 to 30 recent cases, not memory.
import statistics
# Each record: (step, minutes_worked, minutes_waiting, rework_flag)
log = [
("Review request", 15, 120, False),
("Review request", 20, 240, True),
("Review request", 10, 60, False),
]
def summarize(records, step):
rows = [r for r in records if r[0] == step]
work = statistics.median(r[1] for r in rows)
wait = statistics.median(r[2] for r in rows)
rework = sum(r[3] for r in rows) / len(rows)
print(f"{step}: work {work} min, wait {wait} min, rework {rework:.0%}")
summarize(log, "Review request")Running this prints Review request: work 15.0 min, wait 120.0 min, rework 33%.
Finding waste, delay and bottlenecks on the map
Look for long waits, rework loops, and handoffs that cross lanes. A step with short work time and long waiting time is usually a queue, not a slow task.
Sketching the future-state map
Remove rework loops where possible, merge handoffs that add no value, and move checks earlier in the process. Draw the future state beside the current state, using the same lanes, so each change is easy to compare.
Notation and tool choices
BPMN (Business Process Model and Notation) is a standard that draws lanes inside pools. Text-based diagrams, such as Mermaid, store the map as plain text that version control can track. Choose one tool and use it for both the current and future maps.
Common mistakes and keeping the map useful
Common errors include mapping the ideal process, skipping the people who do the work, adding too much detail, and letting the map go out of date. Review the map every quarter.
Exercise
Exercise
A step has a median work time of 10 minutes and a median wait time of 180 minutes. Where should you aim the first improvement?
Show answer
At the wait time. Most of the elapsed time is queue time, not work, so reducing the wait saves the most time.