Sub topic 1
The Short Run and the Long Run
Economists split a firm's decisions into two time frames, the short run and the long run. This chapter defines both and shows why the split matters for cost. The rest of the tutorial builds on it. Long-run average cost and economies of scale only make sense once you know which inputs a firm can change and which it cannot.
Prerequisites
This chapter assumes you already know:
- Short-run costs: fixed, variable, total, average and marginal cost.
- Diminishing marginal returns, meaning that adding more of one input to a fixed amount of another eventually adds less and less output.
- How to read a cost curve on a graph.
- Basic algebra. The optional worked example uses a square root and a little optimization, but no calculus.
The definition: which inputs can change
The short run and the long run are not lengths of calendar time. They are defined by what the firm is able to adjust.
- Short run: a period in which at least one input is fixed. The firm can change other inputs, called variable inputs, but cannot change the fixed one.
- Long run: a period in which every input is variable. The firm can choose any plant size, any machinery and any number of workers.
Labor and raw materials are usually treated as variable. Plant, heavy equipment and leased premises are usually treated as fixed. In this chapter and the next, capital (written K) is the fixed input and labor (written L) is the variable one.
The length of each period depends on the industry. A food stall can change its equipment within a week, so its long run is short. A steel maker may need years to build a new mill, so its short run can last a decade. The same firm can also face different horizons for different inputs, such as a two-year lease on a warehouse and a ten-year lease on a factory.
What this means for cost
The two periods differ in how costs are structured.
| Feature | Short run | Long run |
|---|---|---|
| Inputs | At least one fixed | All variable |
| Fixed cost | Yes, paid at any output, even zero | None |
| Main constraint | Diminishing marginal returns to the variable input | Scale of the whole operation |
| Cost curves | Short-run total, average and marginal cost for one plant size | Long-run total, average and marginal cost across all plant sizes |
| Firm's decision | How much to produce with the existing plant | Which plant to build, and how much to produce with it |
In the short run, a firm that wants more output must add labor to a plant of fixed size. Diminishing marginal returns then push marginal cost up. This is why short-run average cost is U-shaped: fixed cost is spread over more units at first, and later diminishing returns dominate.
In the long run, the firm can add capital as well as labor. Diminishing returns to one input no longer limits it, because it can expand both inputs together. Whatever shapes long-run cost has to come from somewhere else, and the later chapters on economies and diseconomies of scale explain what.
A planning horizon, not a clock
A useful way to think about the long run is as a planning horizon. Before the firm commits to a plant, it faces the long-run problem: given the output I expect to sell, which plant size gives the lowest cost? Once it has built the plant, it is back in the short run, because that choice is now fixed.
This means every point on a long-run cost curve is also a point on some short-run curve. The long-run curve shows the best the firm could do if it could choose its plant in advance. The short-run curve shows what it actually pays once the plant is in place.
A worked example
Suppose a firm produces output q = √(K × L). Each unit of capital costs r = 1 per period and each unit of labor costs w = 1 per period.
Short run. Capital is fixed at K₀. To produce q, the firm needs L = q² / K₀ workers. Total cost is
SRC = r × K₀ + w × q² / K₀
The first term is fixed cost and the second is variable cost. Variable cost grows with q², so marginal cost rises as output rises.
Long run. The firm picks both K and L. With these prices, the cost-minimizing plan uses K = L = q, so the long-run cost is
LRC = 2q
The next code block compares the two for different plant sizes.
# Cobb-Douglas-style example: q = sqrt(K * L), w = r = 1.
def sr_cost(q, k0, w=1.0, r=1.0):
# Capital fixed at k0; labor needed is q**2 / k0.
return r * k0 + w * q ** 2 / k0
def lr_cost(q, w=1.0, r=1.0):
# Both inputs chosen freely: K = q * sqrt(w/r), L = q * sqrt(r/w).
return 2 * q * (w * r) ** 0.5
print("q K0 short-run long-run")
for q in (10, 20):
for k0 in (5, 10, 20):
print(q, " ", k0, " ", sr_cost(q, k0), " ", lr_cost(q))The output is:
q K0 short-run long-run
10 5 25.0 20.0
10 10 20.0 20.0
10 20 25.0 20.0
20 5 85.0 40.0
20 10 50.0 40.0
20 20 40.0 40.0Three things stand out.
- Short-run cost is never below long-run cost. Being locked into a plant can only hurt or break even, because the long run allows every choice the short run allows and more.
- Short-run cost equals long-run cost only when the fixed plant happens to be the best one for that output. At q = 10 that plant is K₀ = 10, and at q = 20 it is K₀ = 20.
- A plant that is too small is costly because it needs too much labor. A plant that is too large is costly because the firm pays for idle capital. A plant with K₀ = 10 gives the lowest cost at q = 10 but costs 50 instead of 40 at q = 20.
The next chapters turn this observation into the long-run average cost curve.
Common errors
Treating the short run as "a few months" and the long run as "years." The definition is about flexibility. If a firm can change all its inputs in a month, it is in the long run after a month.
Saying long-run costs include fixed costs. In the long run, no input is fixed, so there is no fixed cost. All costs are variable with respect to the planning decision. The firm can avoid every cost by producing nothing and leaving the market.
Confusing fixed and sunk costs. A fixed cost does not change with output. A sunk cost cannot be recovered once it has been spent. A lease the firm cannot cancel is both fixed and sunk. A fixed cost the firm can escape by selling the equipment is fixed in the short run but not sunk. Sunk costs should not influence forward-looking decisions, while fixed costs matter for deciding whether to stay in business over the long run.
Assuming only capital is ever fixed. Labor can be fixed too, for example under long employment contracts or in markets with strict firing rules. What counts as a fixed input depends on the firm and the legal setting.
Forgetting that choices turn into constraints. A firm planning for the long run is free to choose any plant. After it builds one, it operates in the short run until it can change the plant again. Mixing up the planning stage and the operating stage leads to errors such as using long-run curves to predict how a firm reacts to a demand change next month.
What comes next
The following chapters build in order. A short recap of the short-run curves comes first. Then comes long-run total, average and marginal cost, followed by the long-run average cost curve as the lower boundary of the short-run average cost curves. The code example above already shows the key idea: for each output level, the firm picks the plant that gives the lowest cost.
Exercise
A bakery signs a three-year lease on an oven room and can hire or dismiss bakers each week. Which inputs are fixed and which are variable over a six-month horizon, and is the bakery in the short run or the long run for the oven room?
Show answer
The oven room is fixed for six months because the lease runs three years, and bakers are variable. At least one input is fixed, so the bakery is in the short run with respect to its premises. After three years, when the lease ends and it can choose a different size of premises, it can plan in the long run.
Exercise
Using the cost functions in the worked example (SRC = K₀ + q² / K₀ and LRC = 2q), what is the cost penalty at q = 30 for a firm whose plant is fixed at K₀ = 10, compared with a firm that can choose its plant freely?
Show answer
The short-run cost is 10 + 900 / 10 = 100. The long-run cost is 2 × 30 = 60, reached with K = 30. The penalty is 100 − 60 = 40, or about 67% above the long-run cost. The plant is too small for this output, so the firm needs 90 workers, which is far more than the 30 it would need with the right plant.
Exercise
A student says: "In the long run a firm has no costs at all, because it has no fixed costs." What is wrong with this statement?
Show answer
The long run removes fixed costs, not costs. Every input still has a price, so producing output still costs money. The difference is that every input, including capital, can be adjusted. All long-run costs vary with the firm's plan, and a firm that produces nothing in the long run (by exiting) pays nothing.