Sub topic 2
Drafts versus versions: two different kinds of progress
This chapter assumes you already have a creative project in progress, such as a story, a design, a song, or a product concept. It also assumes you can save files and name them. The code examples use a plain text file and, optionally, Git. You don't need Git to follow the ideas.
Two words that get mixed up
People say "draft" and "version" as if they meant the same thing. They don't. Treating them as one thing causes real problems. You may overwrite work you wanted to keep, or lose track of why a change was made. You may also spend weeks polishing something that was never shaped properly.
- A draft is a stage of development. It describes how finished the work is: rough, working, polished, final.
- A version is a saved snapshot. It describes a specific state of the work at a specific moment, which you can return to.
A draft answers the question "How far along is this?" A version answers the question "Which exact copy are we talking about?"
The two ideas work on different axes. Drafts move forward in quality and completeness. Versions move forward in time. You can have five versions of the same rough draft, and you can reach a polished draft after only two versions.
Why the difference matters
Consider what happens when you confuse them.
If you think only in drafts, you tend to work in a single file and overwrite it. "Draft 2" replaces "draft 1". When feedback says the first version of the opening was better, you can't get it back.
If you think only in versions, you may save constantly but never ask what stage the work is in. You end up with forty snapshots of the same unfocused rough draft. Every snapshot differs slightly, and none of them is clearly better.
Keeping both ideas separate gives you two questions to ask at any time:
- What stage is this work in, and what does that stage need? (a draft question)
- Is this state worth saving so I can return to it or compare against it? (a version question)
What a draft stage looks like
Different stages need different kinds of attention. Applying the wrong kind is a common error. Fixing word choice in a rough draft is wasted effort if you later cut the whole section.
| Stage | Main purpose | What to focus on | What to ignore for now |
|---|---|---|---|
| Rough draft | Get the whole idea out | Completeness, the core intent | Polish, style, small errors |
| Working draft | Make the structure sound | Order, gaps, what is missing or extra | Sentence-level wording |
| Polished draft | Improve the experience | Clarity, rhythm, detail, consistency | Large structural changes |
| Final draft | Prepare to share or ship | Errors, formatting, consistency | New ideas |
A draft can move backward. If feedback shows a structural flaw in a polished draft, it becomes a working draft again. That is normal. The stage describes the work's current state, not how many hours you've spent.
What a version looks like
A version is a fixed record. Once saved, it should not change. If you edit it, you have made a new version. This is the property that makes versions useful: you can trust that "v2" today is the same as "v2" next month.
A good version has three properties:
- Identifiable. It has a name or number that you and others can refer to.
- Recoverable. You can open it again exactly as it was.
- Comparable. You can put it beside another version and see what differs.
You don't need a version for every edit. Save one when the work reaches a meaningful state: a finished rough draft, the end of a revision pass, or just before a risky change.
How the two ideas fit together
The following diagram shows one project moving through draft stages while saved versions accumulate along the way.
The solid arrows show maturity. The dashed arrows to v1, v2, and v3 show saved snapshots. The backward arrow shows that a draft can regress when feedback reveals a structural problem. The saved versions still exist, so nothing is lost when that happens.
Worked example: one story, two kinds of progress
Suppose you write a short story called "The Lighthouse Keeper". You write it in one sitting, from beginning to end. This is a rough draft. You save it as v1.
You then reread it and decide the opening is slow. You move the storm scene to the first line and cut two paragraphs of backstory. The story is now a working draft, because its structure is better. You save it as v2.
Notice what happened. The story advanced one stage, from rough to working, and you saved two versions. Now say you try a different ending. The story is still a working draft, but you now have a third version, v3, containing the new ending. The draft stage did not change, but the version count did.
Later, a reader says the new ending is weaker. You open v2 and continue from there. This is only possible because you saved v2 as a fixed snapshot.
Recording the difference with a change log
A version is more useful when you know why it exists. A change log entry records the goal, what changed, and the reason. You can keep it in the same folder as the work.
# Change log: short story "The Lighthouse Keeper"
## v2 (from v1)
- Goal: make the opening scene create tension
- Changed: moved the storm from paragraph 5 to the first line
- Cut: two paragraphs of backstory
- Why: reader feedback said the first page felt slow
- Open question: does the ending still land?
## v1
- First complete draft, written in one sitting to capture the ideaEach entry names the version, the version it came from, and one goal. The "Open question" line passes a concern forward to the next pass. A later chapter covers change logs in detail. For now, notice that the log ties each version to a purpose.
Choosing when to create a version
Creating too many versions makes comparison hard. Creating too few puts your work at risk. These are practical rules:
- Save a version when you finish a complete rough draft.
- Save a version at the end of each revision pass, before you start the next one.
- Save a version before any change you might regret, such as cutting a large section.
- Save a version before and after you apply feedback from another person.
- Don't save a version for tiny corrections like fixing a typo, unless it is part of a pass.
If you hesitate, ask whether you would want to return to this exact state. If the answer is yes, save it.
Optional: tracking versions with Git
Git is a tool that records versions of text files. It suits stories, scripts, lyrics, specifications, and other text-based ideas. It is less useful for images and audio, where you can use dated file names or the history features of your design or audio software instead.
This example saves two versions of the story and compares them. It assumes story.md already exists in the folder.
git init lighthouse-story
cd lighthouse-story
# Save the first complete draft as a named version
git add story.md
git commit -m "v1: first complete draft"
git tag v1
# After revising the opening, save the second version
git add story.md
git commit -m "v2: open with the storm, cut backstory"
git tag v2
# See exactly what changed between the two versions
git diff v1 v2A commit is a saved snapshot in Git. A tag is a readable name attached to a commit, so you can refer to it as v1 instead of a long identifier. The git diff v1 v2 command shows every line that was added, removed, or changed between the two.
Common errors
- Overwriting instead of saving. Editing the only copy means your earlier state is gone. Save the version first, then edit.
- Editing a saved version. If you change "v2" after naming it, the name no longer means one fixed thing. Make a new version.
- Vague names. Names like "final", "final2", and "final_REAL" say nothing about stage or order. Use numbers or dates, and record the stage in your log.
- Polishing too early. Spending effort on wording in a rough draft makes you reluctant to cut. Match your attention to the stage.
- Never advancing the stage. Endless small versions without a decision about stage mean you are circling. Name the stage and decide what it needs.
- Treating regression as failure. Moving back from polished to working is a sound response to structural feedback.
Edge cases
Some projects don't fit the neat sequence.
- Parallel drafts. You may have two working drafts at once, for example two endings. These are separate branches of work, each with its own versions. A later chapter covers branching.
- Collaborative work. When several people edit, versions record who changed what. Agree on naming and on who may create an official version.
- Non-text work. For a design or a song, a version may be an exported file or a project snapshot. The principle is the same: fixed, named, and recoverable.
- Large pieces. A long work may have sections at different stages. The opening may be polished while the middle is still rough. Track the stage per section, and version the whole.
Exercise
You wrote a complete first pass of a product pitch in one sitting. You then rewrote the order of the sections and cut a weak argument. After that, you tried a different closing paragraph and saved it separately. Name the draft stage of the pitch now, and say how many versions you should have at minimum, and why.
Show answer
The pitch is a working draft, because you changed its structure (order and cuts) rather than only its wording. You should have at least three versions: v1 for the complete first pass, v2 for the restructured pitch, and v3 for the version with the different closing. The stage advanced once (rough to working), while versions accumulated at each meaningful state, which shows that drafts and versions are separate kinds of progress.
Exercise
A teammate says, "I changed v3 slightly, so it's still v3." Explain the problem and what they should do instead.
Show answer
A version is a fixed snapshot, so changing it destroys the guarantee that "v3" always means the same thing. Anyone who compared or relied on v3 earlier now has a different file under the same name. The teammate should leave v3 unchanged, save the edited state as a new version such as v4, and add a change log entry giving the goal and reason.
Exercise
Feedback on your polished draft says the central argument is unclear. Which stage should the work return to, and does the move cost you your earlier versions?
Show answer
It should return to the working draft stage, because the problem is structural and wording polish won't fix it. The earlier versions are not lost, since each was saved as a fixed snapshot. You can compare them and continue from whichever one best supports the clearer argument.