Sub topic 4
Define success criteria and constraints up front
This chapter assumes you have led a team or project, and that you run one-on-ones and ask for regular status updates. It also assumes you have already framed expectations as outcomes, which the previous chapter covered. Here you make those outcomes checkable. You will learn to write success criteria and constraints so the owner knows what "done" means and where the edges are, and you can check progress without asking how the work is done.
Why an outcome is not enough
An outcome says what should be true when the work is finished. "Customer onboarding emails are rewritten and live" is an outcome. It still leaves questions open:
- Live for whom? All new signups, or one region?
- Rewritten to what standard? Approved by whom?
- How will anyone know the emails worked?
- What is off limits while the work happens?
When these questions stay open, two things go wrong. The owner guesses, and the guess may differ from yours. Or the owner asks you each time a question comes up, and you become the approval step for every decision. Both end in the pattern you want to avoid: you step into the method because the boundaries were never stated.
Success criteria and constraints close those gaps. They sit in the middle of a delegation brief, between the outcome and the check-ins. If they are missing, the check-ins have nothing to measure against.
Success criteria: how you will know
Success criteria are the observable conditions that must be true for the outcome to count as achieved. Each one should let a third party look at the result and say yes or no.
What a good criterion looks like
A useful criterion has four properties:
- Observable. Someone can see it without asking the owner for their opinion.
- Specific. It names a thing, a number, a date, or a group of people.
- Tied to the outcome. It describes the result, not an activity on the way to it.
- Within the owner's influence. The owner can affect it through their own work.
Compare these pairs:
| Vague | Checkable |
|---|---|
| Improve the onboarding emails | New copy is live for all new signups |
| Make sure support is happy | Support tickets tagged "onboarding" are reviewed after two weeks |
| Get the report done soon | Report is sent to the finance lead by 12 December |
| Do a thorough job on testing | All checkout flows in the test plan pass, and failures are logged with owners |
The left column describes effort or feeling. The right column describes a state of the world you can inspect.
Separate the result from the leading signal
Some outcomes take time to show their effect. Emails can go live today, but whether they reduce support tickets only appears after weeks. Write both kinds of criteria and label them.
- Delivery criteria confirm the work was finished. "New copy is live for all new signups."
- Impact criteria confirm the work had the intended effect. "Tickets tagged onboarding are reviewed after two weeks."
Notice the wording in the second example. The brief does not promise that tickets will fall by a set amount. It commits to a review. That is a deliberate choice. If the owner cannot control the result, such as customer behavior, holding them to a fixed number turns accountability into a lottery. Commit them to the part they control, and commit both of you to looking at the evidence.
Include a quality bar when quality matters
"Done" often has a quality dimension that a date cannot capture. State the bar in terms of a check, not a taste.
- A named reviewer signs off ("Legal reviews any pricing language").
- A test or checklist passes.
- A comparison holds ("No more errors than the current process").
Avoid "high quality" or "polished." Those words invite a later disagreement where you say it is not good enough and the owner says it is. If you cannot name a check, say who will judge and what they will look at.
Keep the list short
Three to five criteria is usually enough. A list of fifteen turns into a checklist that the owner works through mechanically, and it hides which criteria matter most. If everything is a criterion, nothing is a priority. When you have many, mark which ones are required and which are nice to have.
Constraints: where the edges are
Constraints are the limits the owner must stay within while pursuing the outcome. They answer the question "what must not change or be crossed?" without telling the owner how to proceed.
Common kinds of constraints:
- Scope. "No changes to the billing flow."
- Policy and compliance. "Legal reviews any pricing language."
- Resources. Budget, headcount, tools, or the share of time the person can spend.
- Dependencies. Other teams or systems the work must not disrupt.
- Time. A fixed date, or a window when changes are not allowed.
- Stakeholders. People who must be consulted before certain actions.
Constraints are not methods
This is the line to watch. A constraint limits the result space. A method prescribes the route.
| Constraint (keep) | Method (leave to the owner) |
|---|---|
| Do not change the billing flow | Write the emails in this order, using this template |
| Legal reviews pricing language | Draft in a shared document, then send to Legal on Wednesday |
| Stay within the agreed budget | Use vendor X for the design |
If you find yourself writing a "constraint" that dictates sequence, tools, or format, ask whether a real risk sits behind it. If so, state the risk as the constraint ("The output must be importable into the CRM"). If there is no risk, only a preference, drop it. Stating preferences as constraints is one of the most common ways micromanagement enters through the front door.
Say why
A constraint with a reason is easier to respect and easier to reason about at the edges. "No changes to the billing flow, because finance is auditing it this quarter" lets the owner decide sensibly when a case arises that you did not anticipate. A bare rule forces them to come back and ask.
Decision rights: who decides what
The sample brief adds one more element that belongs with constraints: decision rights. These state which decisions the owner makes alone and which need you first.
In the example brief: "You decide copy, tone, and sequencing. Check with me before changing who receives the emails." That sentence does two jobs. It gives the owner full authority over the main body of work, and it names the one decision that carries enough risk to need your input.
A practical way to write decision rights is to sort decisions into three groups:
- The owner decides. Most choices about method, order, tools, and detail.
- The owner decides and tells you. Choices you want to know about but need not approve, such as a change in a vendor contact.
- The owner asks first. Choices that cross a constraint, affect other teams, spend money beyond a limit, or are hard to undo.
Keep the third group small and specific. If almost everything needs approval, the work has not really been delegated.
A worked example
Suppose you manage a support operations team. You want Priya to cut the time customers wait for a first reply. Your first draft of the delegation reads:
> Improve first-response time and fix the queue problems.
Before sending it, you test it against the properties above and find it fails. "Improve" has no target, "fix the queue problems" names no result, and nothing says what Priya may change. Here is the rewritten brief.
## Delegation brief
**Outcome:** Customers get a first reply faster during weekday hours.
**Why it matters:** Slow first replies are the top complaint in last quarter's survey.
**Success criteria:**
- Median first-reply time for weekday tickets is under 2 hours, measured from the support dashboard, by 31 January.
- No drop in the customer satisfaction score for replied tickets (current baseline: 4.4).
- The new triage rules are written down so another team lead can run them.
**Constraints:**
- No new headcount and no change to shift hours (HR is reviewing schedules).
- Escalation to the security team stays as it is today.
- Customer-facing macros that mention refunds are reviewed by Finance.
**Decision rights:** You decide triage rules, queue structure, and tooling within the current licences. Tell me if you change who handles billing tickets. Ask me before changing the escalation path or any customer-facing policy.
**Check-ins:** Short written update every Tuesday. Raise a blocker the same day you see it.
**Due date:** 31 January.Look at what each part does:
- The first criterion is a number with a data source and a date. Priya and you will read the same dashboard.
- The second criterion is a guardrail. It stops her from hitting the speed target by sending fast, unhelpful replies. A good set of criteria often includes one measure that protects against gaming another.
- The third criterion asks for a handover artifact, so the result does not live only in Priya's head.
- The constraints name real limits and give their reasons.
- Nothing prescribes how she builds the triage rules.
The guardrail pattern
The satisfaction criterion deserves attention. Any single measure can be met in a way that defeats its purpose. Pair a speed measure with a quality measure, a volume measure with an error measure, and a cost measure with a satisfaction measure. This protects the outcome without adding supervision.
Common errors
- Criteria that restate the outcome. "The project is successful" tells no one anything. Name the evidence.
- Criteria based on activity. "Hold three meetings with the vendor" measures effort. If the vendor problem is solved with one call, the owner is still penalized or pushed to waste time.
- Targets the owner cannot influence. If a result depends mostly on the market, a customer, or another team, commit the owner to the part they control and to reviewing the evidence.
- Hidden constraints. The owner proceeds, crosses a limit you never mentioned, and you respond with frustration. Before you send the brief, ask yourself what would make you step in, then write that down.
- Constraints that are really preferences. Test each one by asking what harm follows if it is ignored. No harm means it is a preference.
- Changing criteria silently. If the situation shifts, update the brief in writing and tell the owner. Quietly moving the bar later is the fastest way to lose trust.
- A brief delivered once and never revisited. Criteria and constraints are your reference points in every check-in. Bring them back into the weekly update, as in the next chapters.
Writing the brief together
You do not have to write the brief alone, and often you should not. The owner knows the work better than you do, and a brief they helped shape is one they understand and accept.
A short process works well:
- Write a draft with the outcome, why it matters, and your first view of criteria and constraints.
- Share it and ask the owner to restate the outcome and the criteria in their own words.
- Ask: "What is unclear? What would you want to decide that I have not given you? What risks do you see?"
- Adjust the criteria where the owner has better information, such as a more realistic measure or a dependency you missed.
- Agree and record the final version where both of you can find it.
The restating step in particular catches mismatches early. If the owner's version of "done" differs from yours, you learn it on day one, not on the due date.
A checklist before you send a brief
- Can someone who has not spoken to either of us tell whether each criterion is met?
- Does at least one criterion guard against meeting another in a harmful way?
- Is each constraint tied to a real risk, and do I give the reason?
- Have I removed anything that dictates the method without a risk behind it?
- Are decision rights clear, with a short list of "ask first" items?
- Does the check-in plan refer back to these criteria?
Summary of the working model
- Success criteria describe how anyone can tell the outcome was reached. They are observable, specific, tied to the result, and within the owner's influence.
- Constraints describe the limits the work must respect, with reasons. They are not a hidden list of methods.
- Decision rights say which choices the owner makes alone and which they bring to you.
- Together they give you something concrete to check, so you can ask "where are we against the criteria?" instead of "what are you doing right now?"
Exercise
A manager writes this brief for a team lead: "Outcome: improve the quality of our monthly report. Criteria: put in a lot of effort, make it look polished, and hold weekly meetings with each department. Constraints: use the old template, and write the sections in the order I used last year." Identify the problems and rewrite the criteria and constraints.
Show answer
Problems: "put in a lot of effort" and "make it look polished" are not observable. "Hold weekly meetings" measures activity, not a result. "Use the old template" and "write sections in the order I used last year" are methods or preferences, not constraints tied to a risk. A better version: Criteria: the report is delivered to the leadership team by the third working day of each month; every figure matches the finance system, checked by a named reviewer; and two consecutive reports pass review with no more than two corrections. Constraints: the report must keep the sections the board requires (give the reason, for example the board reviews them each quarter); figures come only from the finance system. Decision rights: the team lead decides layout, order, and how departments contribute; they ask before removing any board-required section.
Exercise
You delegate a customer retention project. The owner cannot control whether customers stay, but can control the changes they make. Write two success criteria, one for delivery and one for impact, and add one guardrail criterion.
Show answer
Delivery: the new renewal reminder sequence is live for all customers whose contracts end after 1 March. Impact: the retention rate for those customers is reviewed against the same quarter last year, and the owner and manager decide together on next steps based on that review (no fixed target, because customer behavior is outside the owner's control). Guardrail: the unsubscribe rate for the reminder emails does not rise above the current level, so retention is not gained by pressuring customers.
Exercise
Why should a constraint include its reason, and how does that help when a case comes up that the brief did not foresee?
Show answer
A reason lets the owner judge the edge case themselves. If they know the billing flow is frozen because finance is auditing it, they can tell that a small change to a billing email template also crosses the line. Without the reason, they either guess or come back to ask, and you become the approval step for every unclear case.