Sub topic 7
Numbered or bulleted: picking the right list
This chapter assumes you have written work documents such as emails, reports, or documentation. It also assumes you know when a list beats a paragraph, which the previous chapter covered. Here you decide which kind of list to use.
The one question that decides it
Ask: does the order of the items matter to the reader?
- If the reader must do the items in sequence, use a numbered list.
- If the items can be read or done in any order, use a bulleted list.
- If you need to refer to an item by number, use a numbered list.
The number is information. A numbered list tells the reader "do these in order" or "there are exactly this many." A bullet tells the reader "these belong together, in no particular order."
Worked example
The release checklist below uses both kinds. The preparation items have no required sequence. The release steps must happen in order.
# Release checklist
## Before you start
- Confirm that the main branch passes all checks.
- Confirm that the changelog is up to date.
- Notify the support team of the release window.
## Release steps
1. Create the release tag.
2. Run the deployment pipeline.
3. Verify the health check page.
4. Announce the release.Swapping the two list types would cause harm. If step 3 were bulleted, a reader could verify the health check before the pipeline has run. If the preparation items were numbered, a reader might think the changelog must be checked after the branch.
Cases that need a numbered list
Numbers fit more than procedures:
- Steps in a procedure: the reader follows them one after another.
- Ranked items: "Top five causes of failed builds," where position carries meaning.
- Items you will cite: "See step 4" or "Requirement 3" only works if items have numbers.
- A fixed count: "The three phases of the audit" tells the reader how much to expect.
Cases that need a bulleted list
Bullets fit groups of equals:
- Prerequisites that all must be met, in any order.
- Options a reader chooses between.
- Features, risks, or notes with no ranking.
Common errors
- Numbering items that have no order. Readers assume a sequence that does not exist.
- Bulleting a procedure. Readers lose their place when they return after an interruption, because bullets give them nothing to find.
- Mixing steps and notes in one list. A note such as "This step takes about five minutes" is not a step. Put it in the step's text or in a callout, so the numbering stays clean.
- Hiding a sequence in a bulleted list. If an item says "after the previous step," the list needs numbers.
Nesting
You can place a bulleted list inside a numbered step when a step has unordered sub-items. Keep nesting to one level. Deeper levels make the structure hard to follow at a glance.
1. Prepare the environment.
- Install the command-line tool.
- Sign in with your work account.
2. Run the deployment pipeline.Exercise
A page lists four ways to contact support: phone, email, chat, and a web form. A second section explains how to reset a password in five actions, from opening the settings page to confirming by email. Which list type fits each section, and why?
Show answer
Use a bulleted list for the contact methods, because they are alternatives with no order. Use a numbered list for the password reset, because the actions must happen in sequence and the reader may need to find their place again after an interruption.
Exercise
A numbered list has these items: "1. Open the file. 2. Note: this may take a minute. 3. Edit the title." What is wrong, and how do you fix it?
Show answer