Sub topic 8
Rates, Work, and Unit Conversion
This chapter assumes you can set up and solve a proportion, that you know direct and inverse variation, and that you can do arithmetic with fractions and decimals. Rate problems on the GRE are proportion problems with units attached. Most mistakes come from units that don't match, not from the algebra.
What a rate is
A rate is a ratio that compares two quantities with different units. "60 miles per hour" compares miles to hours. The word "per" means "divided by," so 60 miles per hour is 60 miles / 1 hour.
A unit rate has a denominator of 1. Dividing both parts of a rate by the denominator gives the unit rate. If a car travels 150 miles in 2.5 hours, the unit rate is 150 / 2.5 = 60 miles per hour.
The three-part relationship behind most GRE rate problems is:
quantity = rate × timeYou can rearrange it as rate = quantity / time or time = quantity / rate. For travel, the quantity is distance. For work, the quantity is the amount of a job done. For a faucet, it is gallons.
Distance, speed, and time
The formula is distance = speed × time. Keep the units consistent. If speed is in miles per hour, time must be in hours.
Example. A train travels 270 miles in 4.5 hours. A second train travels at 70 miles per hour. How long does the second train take to travel 270 miles?
The second train's time is 270 / 70 = 27/7 hours, about 3.86 hours. The first train's speed is 270 / 4.5 = 60 miles per hour, so the second train is faster and takes less time. Checking that the answer has the right direction is a quick way to catch a flipped fraction.
Average speed is not the average of speeds
Average speed is total distance divided by total time. It is not the mean of two speeds unless the times are equal.
Example. A driver goes 60 miles at 30 miles per hour, then 60 miles at 60 miles per hour. What is the average speed for the whole trip?
- Time for the first leg: 60 / 30 = 2 hours.
- Time for the second leg: 60 / 60 = 1 hour.
- Total distance: 120 miles. Total time: 3 hours.
- Average speed: 120 / 3 = 40 miles per hour.
The average of 30 and 60 is 45, which is wrong. The driver spends more time at the slower speed, so the true average sits closer to 30.
Relative speed
When two objects move toward each other, their speeds add. When they move in the same direction, you subtract the smaller speed from the larger. The gap between them closes at that combined or difference rate.
Example. Two cities are 300 miles apart. One car leaves each city at the same time and they drive toward each other at 45 and 55 miles per hour. They close the gap at 100 miles per hour, so they meet after 300 / 100 = 3 hours.
Work problems
A work rate measures how much of a job is finished per unit of time. If a machine finishes a job in 6 hours, its rate is 1/6 of the job per hour. Treat the whole job as 1.
When several workers or machines work at the same time, their rates add:
combined rate = rate₁ + rate₂ + ...
time together = 1 / combined rateExample. Machine A finishes a job in 6 hours. Machine B finishes it in 3 hours. How long do they take together?
- Rate of A: 1/6 per hour. Rate of B: 1/3 = 2/6 per hour.
- Combined rate: 1/6 + 2/6 = 3/6 = 1/2 per hour.
- Time together: 1 / (1/2) = 2 hours.
The answer, 2 hours, is shorter than either machine's solo time. That is a useful check. Combined time must always be less than the fastest single time.
For two workers with solo times a and b, the shortcut is time together = ab / (a + b). Here (6)(3) / 9 = 2.
When someone works against the job
A drain empties a tank while a pipe fills it. The drain's rate is subtracted.
Example. A pipe fills a tank in 4 hours. A drain empties a full tank in 12 hours. With both open, how long does an empty tank take to fill?
The net rate is 1/4 − 1/12 = 3/12 − 1/12 = 2/12 = 1/6 per hour. The tank fills in 6 hours.
Partial work
Sometimes one worker starts alone and another joins later. Add the fractions of the job done in each stage and set the total to 1.
Example. Worker A can finish a job in 10 hours. Worker B can finish it in 15 hours. A works alone for 2 hours, then B joins. How many more hours does the pair need?
- A does 2/10 = 1/5 of the job alone. Remaining: 4/5.
- Combined rate: 1/10 + 1/15 = 3/30 + 2/30 = 5/30 = 1/6 per hour.
- Time for the rest: (4/5) / (1/6) = 24/5 = 4.8 hours.
Unit conversion
A conversion factor is a fraction equal to 1 that changes the unit without changing the amount. Since 1 hour = 60 minutes, both 60 min / 1 hr and 1 hr / 60 min equal 1. Choose the version that cancels the unit you want to remove.
Example. Convert 90 kilometers per hour to meters per second.
90 km/hr × (1000 m / 1 km) × (1 hr / 3600 s)
= 90,000 m / 3600 s
= 25 m/sThe kilometers cancel and the hours cancel. What remains is meters per second. A handy shortcut is that multiplying km/hr by 5/18 gives m/s.
Converting squared and cubed units
When a unit is squared, the conversion factor is squared too. This is a common trap.
Example. How many square feet are in 5 square yards? One yard is 3 feet, so one square yard is 3² = 9 square feet. Then 5 × 9 = 45 square feet. Using 3 instead of 9 gives 15, which is wrong. For cubic units, cube the factor: 1 cubic yard = 27 cubic feet.
| Quantity | Linear factor | Area factor | Volume factor |
|---|---|---|---|
| Feet to inches | 12 | 144 | 1,728 |
| Yards to feet | 3 | 9 | 27 |
| Meters to centimeters | 100 | 10,000 | 1,000,000 |
Conversions on the GRE
The GRE usually supplies any conversion that is not common knowledge. Expect to know time (60 seconds, 60 minutes, 24 hours, 7 days) and the metric prefixes if the problem relies on them. If a conversion is needed and the test does not give it, the problem is meant to work without it.
Rates as proportions
Many rate problems reduce to a proportion because the unit rate stays fixed.
Example. A printer prints 45 pages in 3 minutes. At the same rate, how many pages does it print in 8 minutes?
45 pages / 3 min = x pages / 8 min
x = 45 × 8 / 3 = 120The unit rate is 15 pages per minute, and 15 × 8 = 120. When the rate is constant, both methods agree.
Be careful when the rate is not constant. Average speed over a trip with a slow start and a fast finish does not let you scale distance proportionally to time for any sub-interval.
Common errors
- Mixed units. Minutes and hours in the same equation. Convert first.
- Averaging speeds. Use total distance over total time.
- Adding times instead of rates. For workers together, add the rates, not the solo times.
- Flipping a rate. Check the answer's direction. More workers means less time.
- Linear factor for area or volume. Square or cube the factor.
- Ignoring the question's unit. The answer may need minutes when you computed hours.
Quantitative comparison angle
In a quantitative comparison, a rate question might compare "the time for two machines working together" with "half of the faster machine's solo time." Use the shortcut. Solo times 6 and 3 give 2 hours together, and half of 3 is 1.5. So the first quantity is larger. In general, two machines together take more than half of the faster machine's time unless they are equally fast, in which case the two quantities are equal. You can verify this by estimation and avoid heavy algebra.
Exercise
Pump A fills a pool in 12 hours. Pump B fills the same pool in 4 hours. Both pumps start together with the pool empty. After 2 hours, pump B breaks, and pump A finishes alone. How many total hours does it take to fill the pool?
Show answer
Combined rate is 1/12 + 1/4 = 1/12 + 3/12 = 4/12 = 1/3 pool per hour. In 2 hours they fill 2/3 of the pool. The remaining 1/3 is filled by A at 1/12 per hour, which takes (1/3) / (1/12) = 4 hours. The total is 2 + 4 = 6 hours.
Exercise
A cyclist rides 20 miles uphill at 10 miles per hour and then returns the same 20 miles downhill at 20 miles per hour. What is the average speed for the round trip, in miles per hour?
Show answer
Uphill takes 20 / 10 = 2 hours and downhill takes 20 / 20 = 1 hour. Total distance is 40 miles and total time is 3 hours. Average speed is 40 / 3 = 13⅓ miles per hour, not 15.
Exercise
A room is 4 yards by 5 yards. A carpet costs $2 per square foot. What is the cost of carpeting the whole room?
Show answer
The area is 4 × 5 = 20 square yards. Each square yard is 9 square feet, so the area is 20 × 9 = 180 square feet. The cost is 180 × 2 = $360.