Sub topic 3
Combining Workers: Adding Rates
This chapter assumes you can add and subtract fractions, solve linear equations, and convert units of time. Each section builds on the rate idea: a worker's rate is the fraction of a job finished per unit of time.
Combining Workers: Adding Rates
If a worker finishes a job in 6 hours, the rate is 1/6 of the job per hour. When workers work together, their rates add.
from fractions import Fraction
def combined_time(*times):
combined_rate = sum(Fraction(1, t) for t in times)
return 1 / combined_rate
print(combined_time(6, 12)) # 4Opposing Rates: Filling and Draining
A pipe that fills a tank at 1/6 per hour, while a drain empties it at 1/12 per hour, has a net rate of 1/6 - 1/12 = 1/12. The tank fills in 12 hours.
Staggered Starts and Partial Jobs
Split the work into phases. If worker A works alone for 2 hours at 1/6 per hour, A finishes 1/3 of the job. The remaining 2/3 is done at the combined rate of 1/4 per hour, which takes 8/3 hours. The total time is 14/3 hours.
Worker-Time Scaling: Workers, Days, and Output
The total work equals workers multiplied by time. For a job of 36 worker-days:
| Workers | Days |
|---|---|
| 4 | 9 |
| 6 | 6 |
| 9 | 4 |
GRE Strategy: Estimation, Quantitative Comparison, and Checking Answers
Estimate before you calculate. A combined time must be shorter than the fastest worker's time alone. In a quantitative comparison, you can often decide the answer by comparing rates without finishing the arithmetic.
Exercise
Pipe A fills a tank in 4 hours and pipe B fills it in 6 hours. How long do they take together?
Show answer
The rates are 1/4 and 1/6, which add to 5/12. The time is 12/5 = 2.4 hours, which is less than 4 hours, so the answer passes the check.