Sub topic 2
Who the Work Is For and What It Must Do
Assume you can plan a small task, work to a deadline, and communicate with reviewers or stakeholders. This chapter focuses on turning that general understanding into a checkable quality bar.
Start by naming the audience and purpose. The audience is the person who will use, review, or depend on the work. The purpose is the result the work must produce. These choices determine what “good enough” means.
For example, a weekly status report for a team lead needs accurate progress, visible risks, and quick readability. It does not need elaborate charts. A migration guide for new users needs tested commands and clear steps. It does not need to explain unrelated system history.
Consider these questions:
- Who will use or judge the result?
- What decision or action should the result support?
- What information must be accurate?
- What can remain unfinished without harming the purpose?
> Callout note > If you cannot name the audience or the required outcome, pause before polishing. More effort will not fix an unclear purpose.
Writing Acceptance Criteria You Can Check
Acceptance criteria are observable conditions that determine whether a result is acceptable. Replace words such as “clear,” “complete,” or “professional” with tests someone could perform.
For a migration guide, write:
- A new teammate completes the migration using only the guide.
- Every command has been run once successfully.
- The guide covers rollback and lists known limitations.
- The guide is shorter than three pages.
Each criterion should support a pass-or-fail judgment. Criteria also expose trade-offs. If the deadline is short, you might keep the rollback section and remove background history.
A One-Page Definition of Done
A definition of done is a short agreement about the required result, effort limit, and stopping point. Write it before starting so the standard does not rise whenever you find another possible improvement.
## Definition of done: weekly status report
- Audience: team lead; reads in under 2 minutes
- Purpose: support Friday planning
- Must have:
- [ ] Progress against three goals
- [ ] One risk with an owner
- [ ] Numbers matching the tracker
- Not required: charts or formatting polish
- Time budget: 30 minutes
- Stop when: all must-have boxes are checkedUse the bar that matches the work’s stakes and reversibility. High-stakes, hard-to-reverse work needs stronger review. A low-stakes, easily corrected result can use a lighter checklist.
Exercise
A draft internal announcement has accurate dates and instructions but uses plain formatting. The audience can act on it, and corrections are easy. Is the definition of done met?
Show answer
Yes, if the agreed criteria require accuracy and usable instructions but do not require visual polish. Formatting can be improved later if it serves a stated purpose.