Sub topic 2
Evaluating Swatches Before You Commit
This chapter assumes you know basic garment construction, can read a tech pack, and can convert between meters and yards. You should already have swatches from at least one supplier.
Evaluating swatches before you commit
Judge each swatch on five properties: hand (how it feels), drape (how it falls), shrinkage after washing, colorfastness (dye staying put under washing and rubbing), and pilling (small fiber balls forming under abrasion). Test the swatch against your spec, not your memory of the fabric. Wash and dry it the way your customer will, then measure it again.
| Property | Method | Typical target |
|---|---|---|
| Shrinkage | Measure a 20 cm square before and after one wash | Under 3% in both directions |
| Colorfastness | Rub with white cloth, wet and dry | Grade 4 or higher |
| Pilling | Abrasion test, such as Martindale | Grade 3 or higher |
What a minimum order quantity means
A minimum order quantity (MOQ) is the smallest amount of fabric a supplier will sell in one order, stated in meters or yards. Below the MOQ, the supplier refuses the order or charges a premium. Price breaks usually start once the order reaches the MOQ.
Why MOQs exist: dye lots, looms, and setup costs
Mills dye and weave in batches. A dye lot is one batch of dye run in one pass. Fabric from two lots can differ slightly in color, so buying two lots risks a visible mismatch. Looms also need setup time for each color or construction change. Suppliers spread these fixed costs across the meters produced, and the MOQ ensures a run is large enough to cover them.
Estimating yardage and checking it against the MOQ
Required yardage equals units times fabric per garment, plus a waste allowance for cutting loss and defects. Compare that figure with the MOQ.
units = 300 # garments planned
consumption_m = 1.8 # meters of fabric per garment, from the marker
waste = 0.05 # 5% allowance for cutting loss and defects
moq_m = 500 # supplier minimum, in meters
needed_m = round(units * consumption_m * (1 + waste), 1)
if needed_m >= moq_m:
print(f"Need {needed_m} m, meets the {moq_m} m MOQ")
else:
print(f"Need {needed_m} m, short by {round(moq_m - needed_m, 1)} m")The script prints Need 567.0 m, meets the 500 m MOQ.
Exercise
A run of 200 garments uses 1.5 m each, with a 5% waste allowance. The supplier MOQ is 400 m. How much fabric do you need, and does the order meet the MOQ?
Show answer
200 × 1.5 = 300 m, and 300 × 1.05 = 315.0 m. The order is short of the 400 m MOQ by 85.0 m.