Sub topic 6
What a Minimum Order Quantity Means
A minimum order quantity (MOQ) is the smallest amount a supplier will sell you in one order. It is the first number that decides whether a fabric is realistic for your line. This chapter assumes you can read a fabric specification (composition, weight, width, construction) and know the main supplier types: mills, converters, wholesalers, and deadstock sellers. It also assumes you are comfortable converting between meters, yards, and kilograms.
What an MOQ is, in practice
An MOQ is a condition of sale, not a price. A supplier says, "We will sell this fabric, but not less than X." X is usually stated in meters or yards. Knit mills often state it in kilograms, because knitted fabric is weighed.
The same fabric can have an MOQ stated in several ways:
- Per order: the total across everything you buy, for example 500 m.
- Per color: each colorway has its own minimum, for example 300 m per color.
- Per lot or per dye lot: the minimum for one dyeing batch, for example 1,000 m.
- Per article or per design: the minimum for one construction or print.
- Per roll: the supplier sells only whole rolls, and a roll may be 50 to 100 m.
These can combine. A mill might require 500 m per color and 1,500 m per order. If you want three colors, each color must reach 500 m and the total must reach 1,500 m. Always ask which kind of minimum a quote refers to. A quote that says "MOQ 500 m" without more detail is incomplete.
How MOQ varies by supplier type
MOQ is closely tied to who is selling. The table gives typical patterns. Actual numbers vary by country, fabric, and season, so treat them as orders of magnitude and not as quotes.
| Supplier type | Typical MOQ pattern | What you get in return |
|---|---|---|
| Mill (makes the fabric) | High, often 500 to several thousand meters per color or per article | Lowest price per meter, custom colors and constructions |
| Converter (finishes, dyes, or prints greige fabric) | Moderate, often 100 to 1,000 m per color or print | Custom colors and prints without owning a mill |
| Wholesaler or stockist | Low, from a single roll or even a cut length | Immediate availability, higher price per meter, no customization |
| Deadstock seller | Whatever remains, often one lot of a fixed length | Low price and low minimum, but no reorder |
Wholesalers and deadstock sellers hold stock that already exists. Mills and converters make fabric to order. The difference in how the fabric is produced is the main reason MOQs differ so much.
Reading an MOQ against what you need
An MOQ matters only in comparison with how much fabric your order requires. To compare them, calculate the required yardage and check it against the minimum.
Required fabric is the number of units, times the consumption per unit, plus an allowance for waste. Consumption per unit comes from the marker, which is the layout of pattern pieces on the fabric. The allowance covers cutting loss and defects.
units = 300 # garments planned
consumption_m = 1.8 # meters of fabric per garment, from the marker
waste = 0.05 # 5% allowance for cutting loss and defects
moq_m = 500 # supplier minimum, in meters
needed_m = round(units * consumption_m * (1 + waste), 1)
if needed_m >= moq_m:
print(f"Need {needed_m} m, meets the {moq_m} m MOQ")
else:
print(f"Need {needed_m} m, short by {round(moq_m - needed_m, 1)} m")Here 300 garments at 1.8 m each, plus 5%, gives 567.0 m. That meets the 500 m minimum, so the order clears it. Chapter 8 covers yardage estimation in more detail. For now, the point is that the comparison is simple, but the inputs must be honest. A consumption figure taken from a rough guess can move you from "meets the MOQ" to "short" or the other way.
Tiers and the cost of falling below
Many suppliers combine the MOQ with price tiers. The minimum is the entry point, and larger orders unlock lower prices per meter.
# (minimum meters, price per meter), sorted ascending
tiers = [(100, 9.50), (500, 7.80), (1000, 6.90)]
def price_per_meter(meters):
price = None
for minimum, tier_price in tiers:
if meters >= minimum:
price = tier_price
return price
for m in (80, 250, 567, 1200):
p = price_per_meter(m)
print(m, "m:", "below MOQ" if p is None else f"{p:.2f} per m, total {m * p:.2f}")The function returns None for 80 m because that is under the first tier's 100 m minimum. That is the MOQ in this table. At 250 m the price is 9.50 per meter. At 567 m the price drops to 7.80, and at 1,200 m it drops to 6.90.
Note that a larger order can cost less per meter and still cost more overall. It can also be a poor decision if you cannot sell the garments. Chapter 9 covers price breaks and landed cost in full.
Common ways MOQs are misread
Most MOQ mistakes come from a mismatch between how the supplier counts and how you count. Watch for these.
- Per-color minimums applied to the whole order. You need 600 m total across three colors. The supplier's minimum is 500 m per color. You actually need 1,500 m.
- Unit mismatch. A quote in yards compared with your need in meters. One yard is 0.9144 m, so 500 yd is about 457 m. A kilogram MOQ for knits must be converted using the fabric weight and width.
- Ignoring usable width. Fabric width affects consumption. A narrower fabric needs more length for the same garment, so the same MOQ buys fewer garments.
- Forgetting waste. Using the net marker figure without an allowance understates need.
- Treating the MOQ as the whole order. If the minimum is 500 m and you need 567 m, you cannot buy exactly the minimum. Suppliers often sell in whole rolls, so you may have to round up.
- Mixing sampling and production. Swatches and sample yardage are usually sold under much lower minimums, or outside the MOQ entirely. Production MOQ applies to bulk orders.
A kilogram conversion deserves a worked check. Suppose a knit is 180 g/m² and 1.5 m wide, and the mill's MOQ is 200 kg. The weight of one running meter is 180 g/m² times 1.5 m, which is 270 g. Then 200 kg is 200,000 g divided by 270 g, or about 740 m. If the mill quotes the width as a "cuttable" width narrower than 1.5 m, the figure changes, so confirm which width the weight refers to.
gsm = 180 # fabric weight, grams per square meter
width_m = 1.5 # fabric width in meters
moq_kg = 200 # supplier minimum in kilograms
grams_per_meter = gsm * width_m
moq_meters = round(moq_kg * 1000 / grams_per_meter)
print(f"{moq_kg} kg is about {moq_meters} m at {gsm} gsm and {width_m} m wide")Questions to ask a supplier
When a supplier gives you a minimum, a short set of follow-up questions turns it into usable information.
- Is the MOQ per order, per color, per lot, or per roll?
- Is it stated in meters, yards, or kilograms, and at what width?
- Does a lower MOQ exist at a higher price per meter?
- Is a surcharge applied below the standard MOQ, for example a small-lot fee?
- Can the minimum be split across colors or articles?
- Is the fabric in stock, or made to order? Made-to-order fabric usually has a higher MOQ and a longer lead time.
- Will you sell a reserved quantity for repeat orders?
Why the MOQ matters before you design further
An MOQ limits your choices early. If a fabric's minimum is far above what you can sell, either find another fabric or find a way to reduce the minimum. This is cheaper to learn before you build a sample around the fabric. The next chapters cover why MOQs exist, how to estimate yardage against them, and how to negotiate or work around them.
Exercise
A mill quotes a minimum of 400 m per color and 1,000 m per order. You plan 250 garments in each of three colors, using 1.6 m per garment with a 5% allowance for waste. Does the order meet the MOQ? Give the yardage needed for each color and for the order.
Show answer
Per color: 250 × 1.6 × 1.05 = 420 m, which meets the 400 m per-color minimum. For the order: 3 × 420 = 1,260 m, which meets the 1,000 m per-order minimum. Both conditions are met. If you planned only 200 garments per color, each color would need 336 m and would fall short of the per-color minimum, even though other totals might look fine.
Exercise
A knit mill states an MOQ of 150 kg. The fabric is 200 g/m² and 1.6 m wide. Roughly how many meters is that, and would a 400 m need meet it?
Show answer
One running meter weighs 200 × 1.6 = 320 g. 150 kg is 150,000 g, and 150,000 ÷ 320 is about 469 m. A 400 m need falls short by about 69 m, so you would need to order more, find a lower-MOQ source, or negotiate.