Sub topic 3
The diamond model: alternating diverge and converge
This chapter assumes you have run or joined a brainstorm, that you know basic problem solving at work, and that you can read simple Python. It builds on the earlier chapters on divergent and convergent thinking.
The diamond model
The diamond model draws a project as a diamond. The left half widens into many options (diverge). The right half narrows to one choice (converge). A project usually needs several cycles, one per phase.
Pitfalls: premature convergence, anchoring, groupthink
Three failure modes break the cycle:
| Pitfall | Symptom | Correction |
|---|---|---|
| Premature convergence | A vote happens before enough options exist | Set a minimum idea count before any voting |
| Anchoring | The first idea frames every later idea | Have people write ideas silently before sharing |
| Groupthink | The group agrees to avoid conflict | Assign one person to argue against the leading option |
Facilitating diverge and converge sessions with a group
- State the problem in one sentence and the criteria you will use to choose.
- Diverge for a fixed time. Defer judgment and record every idea.
- Cluster similar ideas and remove duplicates.
- Converge by scoring the clusters against the criteria.
- Name the decision, the owner, and what would make you revisit it.
Applying the cycle to a real problem
Suppose a team wants to reduce support tickets. After diverging, it scores three ideas on cost, impact, and ease, using weights.
criteria = {"cost": 0.4, "impact": 0.4, "ease": 0.2}
ideas = {
"Self-service portal": {"cost": 3, "impact": 5, "ease": 2},
"Weekly office hours": {"cost": 4, "impact": 3, "ease": 5},
"Chatbot triage": {"cost": 5, "impact": 2, "ease": 4},
}
def weighted_score(ratings, weights):
return sum(ratings[name] * weight for name, weight in weights.items())
ranked = sorted(
ideas.items(),
key=lambda item: weighted_score(item[1], criteria),
reverse=True,
)
for name, ratings in ranked:
print(f"{name}: {weighted_score(ratings, criteria):.2f}")The top score goes to Weekly office hours at 3.80. The two other ideas tie at 3.60, so the team should discuss them before committing.
Exercise
A team scores an idea 5 on impact and 1 on cost, with weights impact 0.6 and cost 0.4. What is the weighted score, and does a 3.0 threshold accept it?
Show answer
(5 × 0.6) + (1 × 0.4) = 3.0 + 0.4 = 3.4. It clears a 3.0 threshold.