Sub topic 7
Describe what happens next
After the news, the impact, and the cause, your reader asks one thing: what happens now? The recovery plan answers that question. A good plan turns a bad-news update into something the reader can act on, and it shows that the situation is being managed.
This chapter assumes you have read the earlier chapters on leading with the news, stating impact, and explaining cause. It also assumes you know the project well enough to name the people and tasks involved.
What a recovery plan is for
A recovery plan has three jobs.
- It tells the reader when the problem will be fixed, or when they will learn more.
- It shows who is doing the work, so the reader knows whom to ask.
- It lets the reader judge whether the plan is believable. A plan with dates and owners can be checked. A plan with good intentions cannot.
The plan is not an apology and not a promise of perfection. It is a short list of concrete steps, each with an owner and a date, based on what you know today.
The building blocks: action, owner, date
Every step in the plan should contain three things.
- Action: a verb and an object. "Remove duplicate customer records," not "work on data quality."
- Owner: one named person or team. "Sam," not "we" or "the team."
- Date: a calendar date, not "soon," "shortly," or "next week." Include the weekday and the date so the reader can check it against their own calendar.
Compare these two versions.
| Weak | Strong |
|---|---|
| We are working on cleaning up the data and will test as soon as possible. | Sam removes the duplicates by Tue 10 Dec. I run the full export test on Wed 11 Dec. |
| The team is looking into options. | Priya's team compares two vendor quotes by Fri 29 Nov. |
The weak versions cannot be wrong, and that is the problem. Nobody can tell whether they are on track, so the reader has to ask.
Keep it in order
List steps in the order they happen. When one step depends on another, the order matters. In the billing example, the test on 11 Dec cannot happen until the cleanup on 10 Dec is done. Putting the steps in sequence makes that dependency visible without extra explanation.
Plan:
1. Sam removes the duplicate records by Tue 10 Dec.
2. I run the full export test on Wed 11 Dec.
3. Finance receives the export on Thu 12 Dec.If a step depends on something outside your control, say so in the step itself: "Finance receives the export on Thu 12 Dec, if the test passes."
Show the whole path
A recovery plan has two parts, and readers want both.
- Fix: what you are doing about the problem itself.
- Protection: what you are doing to limit the harm while the fix is under way, or to stop it happening again.
Not every update needs both. A late delivery might need only a fix and a new date. An incident that affected customers usually also needs a protective step, such as a temporary workaround. A prevention step belongs in the plan only if you can commit to it. "We will review our estimation process" is vague. "I add a data-cleanup task to our estimate template by Fri 20 Dec" is a commitment.
Include a check step
A fix is not finished until someone confirms it works. Add a verification step to the plan, with its own owner and date. In the billing example, the full export test is the check. Without it, the date you give is the date the work might be done, not the date the reader can rely on it.
The check step also gives you a natural point to report back. If the test passes, you send a short confirmation. If it fails, you already told the reader when they would find out.
Be honest about confidence
Your plan rests on assumptions. Some dates are firm and some are estimates. If you do not say which is which, the reader will treat every date as a promise.
Use the sorting you did earlier: known, assumed, unknown. Apply it to the plan.
Known: 4,200 of 5,000 accounts export cleanly.
Assumed: The remaining 800 have duplicate records only.
Unknown: Whether any of the 800 also have missing addresses. We will know by Mon 9 Dec.Then connect the unknown to the plan. For example: "The 12 Dec date holds if the 800 accounts have only duplicates. I will confirm by Mon 9 Dec. If addresses are also missing, I will send a new date that day."
This does two things. It tells the reader the date has a condition. It also gives a date on which the condition resolves, so the uncertainty has an end.
Ranges and single dates
When you are unsure, you have two honest choices.
- A single date with a condition: "Thu 12 Dec, if the cleanup finishes by Tue 10 Dec."
- A range with a date for narrowing it: "Between Thu 12 Dec and Tue 17 Dec. I will give a single date by Mon 9 Dec."
Avoid a single date you do not believe. If you privately think the real date is 17 Dec, writing 12 Dec sets up a second round of bad news. Readers remember the second delay more than the first.
Offer options when they exist
Sometimes you can recover in more than one way, and each way costs something different. Describe the options briefly and state the trade-off in terms the reader cares about. Then say which you recommend, or say that you need the reader to choose (the chapter on asks and decisions covers this in detail).
The billing example offers two options: the full export on 12 Dec, or a partial export for the 4,200 clean accounts on 6 Dec. The reader can weigh a later complete result against an on-time partial one.
| Option | What the reader gets | Cost |
|---|---|---|
| Full export | All 5,000 accounts on Thu 12 Dec | Reconciliation starts 4 working days late |
| Partial export | 4,200 clean accounts on Fri 6 Dec | 800 accounts are handled separately later |
A table like this works well in a document or a long email. In chat, a two-line list does the same job.
Match the plan to the size of the problem
A small slip needs one or two lines. A large incident needs more. Use these as rough guides.
- Minor delay, low impact: one sentence with the new date and the owner.
- Moderate delay or cost change: three to five steps with owners and dates, plus any condition on the date.
- Serious incident or major overrun: a protective step, a fix, a check, a condition list, and a fixed date for the next update.
Too much detail on a small problem makes it look bigger than it is. Too little on a large one makes the reader doubt you have it under control.
Common errors in recovery plans
- No owners. "The data will be cleaned" does not say who cleans it. Passive voice hides the owner.
- Vague dates. "Early next week" lets the date drift without anyone noticing.
- Promises you cannot control. If another team's work is a dependency, name it and say what you have agreed with them. Do not promise their dates for them.
- A plan with no check. The fix is done, but nobody confirms it.
- Prevention without commitment. "We will make sure this never happens again" cannot be checked. Name one change, an owner, and a date.
- Too many steps. A plan with fifteen items hides the three that matter. Group small tasks into one line.
- Hiding a changed date. If the plan moves later, say that it moved, and say why.
Worked example
Here is a weak plan section, followed by a rewrite.
Before: We are taking steps to resolve the issue and will keep everyone updated. We hope to have things back on track shortly and will look at improving our process going forward.
After:
Plan:
1. Sam removes the duplicate records by Tue 10 Dec.
2. I run the full export test on Wed 11 Dec.
3. Finance receives the export on Thu 12 Dec, if the test passes.
The date depends on the 800 remaining accounts having only duplicate records. I will confirm this by Mon 9 Dec and send a revised date the same day if it does not hold.
To prevent a repeat, I add a data-cleanup task to our estimate template by Fri 20 Dec.The rewrite has named owners, calendar dates, a check step, a stated condition, and one concrete prevention step. The reader can see what happens next and when they will hear more.
Where the plan sits in the update
Place the plan after the cause and before the request for a decision. The reader then understands the problem, sees the response, and is ready to choose between options or give approval. The request depends on the plan, because the reader cannot decide well without knowing what each path involves.
End the plan, or the update, with the date of your next message. The chapter on follow-up cadence covers this in more detail. For now, the rule is simple: never leave the reader wondering when they will hear from you again.
Summary
- A recovery plan answers "what happens now?" with actions, owners, and dates.
- Put steps in the order they happen and name any outside dependency.
- Include a check step so the fix is confirmed, not assumed.
- Say which dates are firm and which depend on an unknown, and give the date the unknown will resolve.
- Offer options with their trade-offs when more than one recovery is possible.
- Size the plan to the problem, and make any prevention step specific.
Exercise
Rewrite this plan section so each step has an action, a named owner, and a calendar date. Add one condition and a check step. The situation: a website redesign is late because the payment provider has not approved the new checkout. Original text: "We are following up with the provider and will launch as soon as we can. We will make sure testing is done properly."
Show answer
A strong answer names people and dates, for example: "1. Maria sends the provider the missing security documents by Tue 3 Dec. 2. The provider confirms approval by Fri 6 Dec (their stated turnaround is 3 working days). 3. Tom runs the full checkout test on Mon 9 Dec. 4. We launch on Wed 11 Dec. This date depends on the provider approving by 6 Dec. I will confirm the approval status on Fri 6 Dec and send a revised date the same day if it has not arrived." The answer should show an owner and date for every step, a test as the check step, a stated condition, and a date on which the uncertainty resolves.
Exercise
A colleague writes: "The migration will finish on Friday. We might hit problems with the old database, but we are confident." What is wrong with the date, and how would you fix it?
Show answer
"Friday" has no calendar date, and the confidence statement contradicts the mention of possible problems, so the reader cannot tell how firm the date is. Fix it by giving the full date and stating the condition, for example: "The migration finishes on Fri 13 Dec, if the old database exports without errors. I will know by Wed 11 Dec and will send a revised date that day if it does not." If the colleague truly does not believe in Friday, a range with a date for narrowing it is more honest.