Sub topic 13
Running small assumption tests
This chapter assumes you have read the earlier chapters on the opportunity solution tree and on mapping and ranking assumptions. You should already have a solution you are considering and a short list of its riskiest assumptions. Here you turn the riskiest assumption into a small test and use the result to decide what to do next.
Why test assumptions instead of solutions
A solution is a bundle of assumptions. If you build the whole solution to find out whether it works, you spend weeks to learn one thing. An assumption test isolates one belief and checks it in days.
The goal of a test is a decision. Before you run it, you should know what result would make you continue, change the idea, or stop. A test with no decision attached produces interesting data and no progress.
Consider the opportunity "I can't tell whether an invited teammate has joined" and the solution "Invite status list". Behind that solution sit assumptions like these:
- Desirability: admins will open the status list after sending an invite.
- Usability: admins can find the status list from the invite screen.
- Feasibility: the product already knows when an invite was accepted.
- Viability: showing status does not create a privacy or permissions problem.
You do not test all four at once. You test the one that is both most uncertain and most damaging if wrong. Your assumption map from the previous chapter should already have ranked them.
Anatomy of a good assumption test
Every small test has the same parts. Writing them down before you run the test prevents you from reinterpreting the result afterward.
| Part | Question it answers | Example |
|---|---|---|
| Assumption | What exactly do we believe? | Admins open the status list after sending an invite. |
| Test | What will we do to check? | Show a prototype of the invite screen to admins and watch what they do. |
| Population | Who takes part, and how many? | Five small-team admins from the interview pipeline. |
| Measure | What will we observe? | How many open the list without being prompted. |
| Threshold | What result counts as "holds"? | At least 4 of 5 open it. |
| Decision | What do we do with each result? | Holds: continue. Fails: test the reminder email instead. |
The threshold is the part people skip. Without it, "3 of 5 opened it" can be read as a success or as a failure, depending on how attached the team is to the idea.
Phrase assumptions so they can fail
An assumption like "users will like the status list" cannot fail. "Admins open the status list after sending an invite" can. Describe an observable behavior by a specific kind of person in a specific situation. Then the result is a count you can compare to the threshold.
Choosing the type of test
Match the test to the type of assumption. Different assumptions need different evidence.
| Assumption type | Typical test | What it shows |
|---|---|---|
| Desirability | Fake door, one-question survey, prototype walkthrough | Whether people want or choose the thing |
| Usability | Moderated prototype test with 5 participants | Whether people can complete the task |
| Feasibility | Engineer spike, data check, API review | Whether you can build it with reasonable effort |
| Viability | Conversation with legal, support, or finance | Whether the business can support it |
| Ethical | Review of data and permissions with affected users | Whether it causes unintended harm |
Feasibility and viability tests often need no customers at all. Ask the engineer in the trio to spend an hour checking whether the product records invite acceptance. That check may kill or confirm the idea faster than any customer test.
Prefer behavior over opinion
Asking "Would you use this?" repeats the mistake that story-based interviewing was designed to avoid. People overstate future intentions. Prefer tests where participants do something:
- Click a button on a prototype.
- Complete a task while you watch.
- Give up something small, such as time or an email address.
When you can only ask, ask about the past. "Last time you invited someone, what did you do afterward?" is a better proxy than "Would you check a status list?"
A walkthrough: testing the status list
The trio ranked "admins open the status list after sending an invite" as the riskiest assumption. The engineer already confirmed that acceptance events are recorded, so feasibility is low risk.
The test plan is a short file the trio can keep next to the snapshot and the tree. This is the same kind of lightweight record as the interview snapshot.
test: 2026-11-27
assumption: "Admins open the invite status list after sending an invite."
type: desirability
method: "Prototype walkthrough, 5 admins from the interview pipeline"
task: "Invite a teammate, then show me how you would check whether they joined."
measure: "Admins who open the status list without being prompted"
threshold: "4 of 5"
decisions:
holds: "Build a thin version and release to 10% of new accounts."
fails: "Test the reminder email to the invitee instead."
unclear: "Change the prototype so the entry point is more visible and rerun with 3 new admins."
owner: "Designer"
review_date: 2026-12-04Notice the unclear outcome. Small tests often end in the middle. Deciding in advance what to do about it keeps the team from drifting.
The designer runs the walkthroughs during the weekly interview slot. Results come back as follows.
| Participant | Opened status list unprompted | Notes |
|---|---|---|
| P1 | Yes | Found it from the invite confirmation message |
| P2 | No | Looked in the team settings page |
| P3 | Yes | Said "this is what I wanted last time" |
| P4 | No | Went to email to look for a reply |
| P5 | No | Did not notice the list |
Two of five opened it, which is below the threshold of four. Two of the three who missed it looked in other places, so the entry point may be the problem. The unclear branch applies. The team makes the link more visible and reruns with three new admins, instead of throwing away a solution on a weak signal.
Sizing the test
Small does not mean sloppy. It means the smallest test that could change your decision.
- Five participants is enough to see the most common usability problems. It is not enough to estimate a percentage.
- A threshold like "4 of 5" is a guide for a go or no-go decision. Do not report it as "80% of users".
- If the cost of being wrong is high, such as changing pricing or removing a feature, run a larger or second test.
- If the cost of being wrong is low and the change is easy to reverse, a quick check may be enough.
A useful rule is to ask how much you would pay to be wrong. A reversible interface tweak justifies an afternoon. A billing change justifies more.
Iterating: test, learn, adjust
Tests are cheap, so run them in sequence and in parallel. The flow below shows how one result leads to the next step.
After each test, update the tree. Mark the assumption as supported or unsupported, and record what you learned under the solution. This keeps the tree a living record and lets a new team member see why a branch was dropped.
Compare more than one solution
Testing a single idea invites confirmation bias, since you are hoping it works. Where you can, test assumptions for two or three solutions under the same opportunity. In the example, the reminder email and the status list both address the same opportunity. If the status list fails, the email may already be partly tested.
Common mistakes
- Testing the whole idea. "Build it and see" is a delivery experiment, not an assumption test. Break it into assumptions and test the riskiest one first.
- No threshold. If you decide what counts as success after you see the data, almost any result will look like success.
- Testing the easy assumption. Teams often test what is simple to test. Rank by risk, then find a cheap way to test that one.
- Leading the participant. Saying "Here is where you check status" before the task removes the thing you wanted to observe.
- Treating one test as proof. A single small test reduces uncertainty. It does not remove it. Revisit when the context changes.
- Skipping the tree update. Results that live only in a chat thread get lost.
Connecting back to the habit
Assumption tests are the part of discovery that lets you reject ideas cheaply. They only stay small if they fit inside the weekly rhythm. Aim for at least one test running at any time, with results reviewed in the same weekly meeting where the trio looks at new interview snapshots. When tests stop happening, the usual cause is that the team stopped ranking assumptions and went back to building whole solutions. The next chapter covers the pitfalls that break the habit.
Exercise
A team believes that "admins will open a status list after sending an invite". They show a prototype to 5 admins, and 3 open it without being prompted. Before the test they had set no threshold. What went wrong, and what should they do before the next test?
Show answer
Without a threshold, 3 of 5 can be read as success or failure, so the team will tend to read it in favor of the idea. Before the next test they should write the assumption, the measure, a threshold (for example 4 of 5), and a decision for each outcome (holds, fails, unclear). They should also check why the 2 who did not open the list missed it, since the cause may be the entry point rather than the idea.
Exercise
Name the assumption type for each, and suggest one small test: (a) "Our system already records when an invite is accepted." (b) "Admins can find the status list from the invite confirmation screen."
Show answer
(a) Feasibility. An engineer checks the data or reviews the events, which takes about an hour and needs no customers. (b) Usability. Run a moderated prototype walkthrough with about five admins, give them the task of checking whether a teammate joined, and count how many find the list without help.