Sub topic 2
Time-Weighted Return and Chain-Linking
Prerequisites and purpose
Assume you understand holding-period return, compounding, and basic portfolio valuation. This chapter explains how to measure a manager's investment performance without allowing investor cash-flow decisions to distort the result.
A time-weighted return (TWR) measures the compound growth of one unit invested with the manager. It removes the effect of external cash flows, such as deposits and withdrawals. This makes TWR appropriate for evaluating the manager's investment decisions.
Breaking the measurement period into sub-periods
Divide the evaluation period whenever an external cash flow occurs. Value the portfolio immediately before the cash flow. Each interval between valuations is a sub-period.
For sub-period \(i\), calculate:
\[ Ri = \frac{V{i,\text{end}}}{V_{i,\text{begin}}} - 1 \]
where the beginning and ending values exclude the external cash flow itself.
Then chain-link the sub-period returns:
\[ R{\text{TWR}} = \left[(1+R1)(1+R2)\cdots(1+Rn)\right]-1 \]
The returns must be compounded. Adding sub-period returns would ignore the effect of returns earned on earlier returns.
def time_weighted_return(period_returns):
growth = 1.0
for r in period_returns:
growth *= 1.0 + r
return growth - 1.0
print(round(time_weighted_return([0.05, -0.02, 0.03]), 5)) # 0.05987Worked example
Suppose a portfolio begins with $1,000,000. It earns 10% before an investor deposits $500,000. It then earns 5% after the deposit.
| Sub-period | Beginning value | Return | Ending value before flow |
|---|---|---|---|
| Before deposit | $1,000,000 | 10.0% | $1,100,000 |
| After deposit | $1,600,000 | 5.0% | $1,680,000 |
The second sub-period begins with $1,600,000: the $1,100,000 portfolio value plus the $500,000 deposit.
\[ R_{\text{TWR}}=(1.10)(1.05)-1=15.5\% \]
The deposit does not create investment performance. It changes the capital base on which the second sub-period return is earned.
Chain-linking process
The process can be viewed as a sequence:
Common errors
- Including a deposit in the denominator as though it were investment profit.
- Failing to divide the period at an external cash flow.
- Adding returns instead of multiplying growth factors.
- Confusing TWR with money-weighted return. Money-weighted return reflects the timing and size of investor cash flows, while TWR is designed to isolate manager performance.
- Using beginning and ending values that include inconsistent accrued income, fees, or valuation conventions.
Exercise
A portfolio earns 4% before a $200,000 withdrawal and 6% afterward. What is the TWR?
Show answer
Chain the returns: (1.04)(1.06) - 1 = 10.24%. The withdrawal does not affect the result because the portfolio is valued before the withdrawal.