Sub topic 6
Portfolio construction, factors, and risk budgeting
This chapter assumes you know mean-variance portfolio theory, covariance and correlation, and the tracking error and information ratio definitions from Levels I and II. It also assumes you have an investment policy statement and a strategic asset allocation (SAA) from the earlier chapters. Portfolio construction turns those targets into holdings. It also decides how much risk is spent on each decision.
From policy to holdings
The SAA fixes asset class weights. Construction answers four further questions:
- How much of each class is held passively and how much actively?
- Which exposures does the portfolio carry within each class (regions, sectors, duration, credit)?
- How is the total risk limit split across asset classes, managers, and factors?
- How will the portfolio be implemented at acceptable cost?
Top-down, bottom-up, and core-satellite
A top-down approach starts with asset classes and macro views, then selects securities. A bottom-up approach starts with security selection and accepts whatever exposures result. Core-satellite combines the two. A low-cost passive or enhanced-index core delivers the policy exposure. Smaller active satellites seek alpha. The core keeps total tracking risk low and fees down. The satellites make active risk visible, because each one has its own budget.
Asset class versus factor views
Asset class labels can hide shared risks. Equities, high-yield credit, and some private assets all load on the same equity-market and economic-growth factors. A portfolio that looks diversified across classes can be concentrated in one factor.
| Feature | Asset-class approach | Factor-based approach |
|---|---|---|
| Unit of analysis | Equity, bonds, real assets | Market, size, value, momentum, duration, credit, inflation |
| Strength | Matches the IPS and the investable universe | Reveals overlapping risk |
| Weakness | Hides common drivers | Factor premiums are unstable and may be crowded |
| Typical use | SAA and benchmarks | Risk diagnosis, smart-beta tilts, active risk decomposition |
Rewarded factors come with real cost. Premiums can vanish for years, and implementation costs reduce them. Capacity limits matter when many investors hold the same tilt. Treat a factor tilt as an explicit, budgeted bet.
Risk budgeting
Risk budgeting is the process of deciding how much total risk to take and allocating it to where it is expected to be rewarded. Risk can be measured as total volatility, as tracking risk against a benchmark, or as value at risk. The budget is only as useful as the measure behind it.
Two measures drive the allocation:
- Marginal contribution to risk (MCTR) is the change in portfolio volatility from a small increase in one holding.
- Percent contribution to risk is w × MCTR ÷ portfolio volatility. These percentages sum to 100%.
Capital weights are a poor guide to risk weights. The code below uses the 60/40 portfolio (15% and 5% volatility, correlation 0.2) from the asset allocation chapter.
import math
weights = [0.6, 0.4]
vols = [0.15, 0.05]
corr = 0.2
cov = [
[vols[0] ** 2, corr * vols[0] * vols[1]],
[corr * vols[0] * vols[1], vols[1] ** 2],
]
port_var = sum(
weights[i] * weights[j] * cov[i][j] for i in range(2) for j in range(2)
)
port_vol = math.sqrt(port_var)
for i, name in enumerate(["equity", "bonds"]):
cov_with_port = sum(weights[j] * cov[i][j] for j in range(2))
mctr = cov_with_port / port_vol
pct = weights[i] * mctr / port_vol
print(f"{name}: MCTR {mctr:.4f}, share of risk {pct:.1%}")
print(f"Portfolio volatility: {port_vol:.2%}")The output shows equity with an MCTR of about 0.147 and about 91.8% of total risk, bonds with an MCTR of about 0.020 and about 8.2%, and portfolio volatility of about 9.60%. Equity is 60% of capital but over 90% of risk.
Budgeting active risk
For active managers, the budget is expressed as tracking risk. The information ratio (IR) is active return divided by tracking risk. A manager with 1.5% expected active return and 3% tracking risk has an IR of 0.5. The risk budget is allocated efficiently when the ratio of expected excess return to marginal contribution to risk is equal across all decisions. If one manager has a higher ratio, move budget toward that manager until the ratios equalize.
Two related ideas help here. Active share measures how much the holdings differ from the benchmark, while tracking risk measures how much returns differ. Low tracking risk with high active share can happen when the active positions offset each other. Neither measure alone describes the full active exposure.
Common errors
- Budgeting by capital weight instead of risk contribution.
- Using one volatility and correlation estimate in stress periods, when correlations usually rise.
- Treating historical factor premiums as certain forward-looking returns.
- Adding managers whose active bets overlap, so combined tracking risk is higher than intended.
- Ignoring transaction costs, liquidity, and taxes when comparing a rebalanced or tilted portfolio with the policy portfolio.
Exercise
A portfolio is 70% equity and 30% bonds. Equity's marginal contribution to risk is 0.12 and bonds' is 0.01. Portfolio volatility is 8.7%. What percentage of risk does each asset class contribute, and what does the result say about the capital weights?
Show answer
Equity contributes 0.70 × 0.12 ÷ 0.087 = 96.6% of risk. Bonds contribute 0.30 × 0.01 ÷ 0.087 = 3.4%. The portfolio is 70% equity by capital but almost entirely an equity-risk portfolio. A risk budget would reduce equity risk or add return sources that load on different factors.