Sub topic 14
Implementation choices: active vs passive, core-satellite, overlays, risk budgets
This chapter assumes you know the strategic asset allocation (SAA) process, tracking error, the information ratio, and futures basics. It covers how to turn a policy allocation into a funded portfolio. The target weights are already set. The questions here are who manages each slice, how much risk each slice may take, and how derivatives keep the exposures on target.
Active vs passive: a decision made per asset class
The choice is made asset class by asset class, not once for the whole portfolio. Three factors drive it.
- Market efficiency. In large, heavily researched markets such as US large-cap equity and developed-market government bonds, prices adjust quickly and few managers beat the benchmark after fees. In less efficient areas, such as small-cap, emerging-market, or high-yield credit, skilled managers have more to exploit.
- Cost. A passive mandate may charge 0.03% to 0.10% a year. An active mandate often charges 0.50% or more. Active management pays only if expected alpha after fees, taxes, and trading costs is positive, and the investor must also believe it can identify the skilled managers in advance.
- Constraints. Taxes, liquidity needs, governance capacity, and the ability to monitor managers all favor passive. Some benchmarks are hard to replicate cheaply, which favors active or enhanced approaches.
Two measures help you judge how "active" a portfolio really is:
- Tracking error (active risk) is the standard deviation of active returns, which are portfolio return minus benchmark return.
- Active share is half the sum of absolute weight differences between portfolio and benchmark: ½ Σ |wportfolio − wbenchmark|. A value near 0% is an index fund. A value above about 60% suggests real stock selection. A "closet indexer" charges active fees for an active share that is low.
A middle path is the enhanced index or factor-based (smart beta) mandate. It keeps tracking error small, perhaps 0.5% to 2%, and tilts toward factors such as value or quality at a cost between passive and fully active.
Core-satellite
A core-satellite structure splits the portfolio in two.
- Core: a large passive or low-tracking-error holding that delivers the benchmark exposure cheaply.
- Satellites: smaller, higher-conviction active or alternative positions that seek alpha.
The core keeps total costs and tracking error low. The satellites concentrate the active risk where the investor has the most confidence. The satellites should be diversified in their sources of alpha, meaning different managers, styles, or markets. Otherwise their active risks are correlated and add up instead of diversifying.
The structure also lets the investor assign a budget to active risk explicitly. Since a portfolio's overall tracking error is not a simple sum, you combine components with a covariance calculation.
Risk budgeting for active risk
Risk budgeting treats risk as the scarce resource to allocate. The investor sets a total active risk limit, such as 1.5% tracking error, and divides it among managers or strategies.
The guiding rule is to give more budget where the information ratio (IR) is higher. Expected active return is roughly IR × active risk, so each unit of risk should go to the manager with the best expected reward per unit. In theory, budgets are set so that the marginal ratio of expected alpha to marginal risk is equal across managers.
For uncorrelated components, total tracking error is the square root of the sum of squared contributions. Here is a core with two satellites:
from math import sqrt
# (weight in portfolio, stand-alone tracking error in %)
components = {
"core": (0.70, 0.5),
"satellite_A": (0.15, 6.0),
"satellite_B": (0.15, 8.0),
}
# Active-risk contribution = weight * tracking error (assumes zero correlation)
contrib = {name: w * te for name, (w, te) in components.items()}
total_var = sum(c**2 for c in contrib.values())
total_te = sqrt(total_var)
print(round(total_te, 2)) # 1.54
for name, c in contrib.items():
share = c**2 / total_var * 100
print(name, round(c, 2), f"{share:.1f}%")
# core 0.35 5.2%
# satellite_A 0.9 34.1%
# satellite_B 1.2 60.7%The satellites hold 30% of the capital but use about 95% of the active risk budget. The risk budget shows this, and the capital weights do not.
Risk budgets also appear at the total-portfolio level. Some investors budget in terms of surplus volatility, drawdown, or value at risk, not tracking error. The idea is the same. Pick a limit, then allocate it to the parts that earn it.
Overlays
An overlay is a derivatives position, run separately from the underlying holdings, that changes the portfolio's exposure without trading the securities. Overlays are managed by the investor or a specialist.
Common uses:
- Rebalancing. Futures move the portfolio back to policy weights quickly and cheaply, without selling illiquid or tax-sensitive holdings.
- Beta or duration adjustment. A tactical view can be expressed with equity index futures or bond futures and swaps. A liability-driven investor can top up duration this way.
- Currency hedging. Forwards hedge foreign-currency exposure, often partially or on a rule-based schedule.
- Completion portfolio. Satellite and core mandates may leave the total exposure off target. A completion overlay corrects the gap in total.
- Portable alpha. The investor gets beta from derivatives and invests the cash in an alpha strategy, separating the two decisions.
Sizing an equity futures overlay is a short calculation. Suppose a $500 million portfolio is 5 percentage points under its equity target. The index futures price is 5,000 and the contract multiplier is $50:
portfolio_value = 500_000_000
equity_shortfall = 0.05 # 5 percentage points under target
futures_price = 5_000
multiplier = 50
notional_needed = portfolio_value * equity_shortfall
contract_value = futures_price * multiplier
contracts = notional_needed / contract_value
print(notional_needed, contract_value, contracts)
# 25000000.0 250000 100.0The investor buys 100 contracts. Because futures need only margin, the remaining cash can sit in short-term instruments, so the derivatives add exposure without a sale.
Overlays bring their own risks: counterparty and margin or liquidity risk (variation margin calls come in cash), basis risk between the futures and the actual holdings, roll costs, and operational and governance demands. The policy should cap derivative exposure and require that collateral be available.
Putting the choices together
| Choice | What it controls | Main benefit | Main risk |
|---|---|---|---|
| Passive core | Benchmark exposure | Low cost, low tracking error | No alpha; full market risk |
| Active satellites | Alpha sources | Concentrates skill where expected | Fees, manager risk, correlated bets |
| Overlay | Exposure without trading | Fast, cheap adjustment | Margin, basis, and counterparty risk |
| Risk budget | Allocation of active risk | Ties risk to expected reward | Relies on estimated IRs and correlations |
A reasonable sequence is:
- Set the SAA and the total active risk limit from the IPS, including the investor's tolerance for underperforming the benchmark.
- Decide for each asset class whether active management has a credible chance of paying after costs.
- Fund passive cores first, then size satellites by IR and by how correlated their active risks are.
- Use overlays for rebalancing and for exposures that are cheaper to hold synthetically, within stated derivative limits.
- Review realized tracking error and risk contributions against the budget on a regular schedule.
Common errors
- Treating satellite capital weights as the risk budget, when risk shares can be very different from capital shares.
- Using backtested or manager-supplied IRs without shrinking them. Estimated IRs are noisy, and over-trusting them concentrates the budget in the best-looking track record.
- Ignoring fees when comparing active with passive. A 0.60% gross alpha less a 0.50% fee leaves 0.10%.
- Letting an overlay drift into a leveraged position. Exposure from derivatives counts toward policy limits.
Exercise
A portfolio has a core with 80% of capital and 0.4% tracking error, and one satellite with 20% of capital and 5% tracking error. Assume the active returns are uncorrelated. (a) What is the total tracking error? (b) What share of the active risk budget does the satellite use?
Show answer
(a) Core contribution = 0.80 × 0.4 = 0.32%. Satellite contribution = 0.20 × 5 = 1.00%. Total = sqrt(0.32² + 1.00²) = sqrt(0.1024 + 1.0) = sqrt(1.1024) ≈ 1.05%. (b) Satellite share = 1.0 / 1.1024 ≈ 90.7% of active risk, even though it holds only 20% of the capital.
Exercise
A $200 million portfolio is 3 percentage points over its bond-duration-neutral equity target and the manager wants to cut equity exposure with index futures priced at 4,000 with a $250 multiplier. How many contracts should be sold, and why might the manager prefer this to selling stocks?
Show answer
Notional to remove = 200,000,000 × 0.03 = $6,000,000. Contract value = 4,000 × 250 = $1,000,000. Contracts = 6 (sell 6). Selling futures avoids trading costs on the underlying holdings and avoids realizing taxes or disturbing active managers' positions, and it is easy to reverse when the portfolio is rebalanced back.