Sub topic 15
Effective Duration for Bonds with Uncertain Cash Flows
This chapter assumes you can price a bond as a present value, you know modified duration as the price sensitivity to the bond's own yield to maturity, and you know the duration-plus-convexity approximation. It covers why modified duration fails for some bonds and how effective duration fixes the problem.
Why Modified Duration Is Not Enough
Modified duration comes from a formula applied to a fixed list of cash flows. The formula assumes that the amount and timing of each payment do not change when yields change. That holds for an option-free bond, where the coupons and the par value are promised on known dates.
Many bonds break that assumption:
- A callable bond lets the issuer redeem early, usually when yields fall.
- A putable bond lets the investor sell it back at a set price, usually when yields rise.
- A mortgage-backed security pays principal faster when rates fall, because borrowers refinance.
- A floating-rate note resets its coupon as a benchmark rate moves.
For these bonds the cash flows depend on the interest rate path. There is no single yield to differentiate against. A modified duration calculated from the promised cash flows to maturity would ignore the option, so it can overstate the price sensitivity of a callable bond when yields are low.
The Working Model
Effective duration measures price sensitivity to a change in the benchmark yield curve, not to the bond's own yield to maturity. The procedure has four steps:
- Take the current price, P0.
- Shift the benchmark curve down by a small amount, dy, and reprice the bond with a model that reflects how its cash flows react. This gives P-down.
- Shift the curve up by the same dy and reprice. This gives P-up.
- Apply the formulas below.
Effective duration is:
(P-down − P-up) / (2 × P0 × dy)
Effective convexity is:
(P-down + P-up − 2 × P0) / (P0 × dy²)
The numerator of the duration formula is the price change across a two-sided shift of 2 × dy. The denominator scales it to a percentage change per unit of yield.
The pricing model is where the difficulty sits. For a callable bond, it must change the expected redemption date when the curve moves. The exam does not ask you to build that model. It gives you P0, P-down, P-up, and dy, and asks you to apply the formulas.
A Worked Calculation
Suppose a bond trades at 100.00. A 50 basis point parallel shift (dy = 0.005) gives these model prices:
| Scenario | Price |
|---|---|
| Curve down 50 bp | 103.00 |
| Current curve | 100.00 |
| Curve up 50 bp | 97.20 |
Effective duration is (103.00 − 97.20) / (2 × 100 × 0.005) = 5.8 / 1.0 = 5.8.
Effective convexity is (103.00 + 97.20 − 200) / (100 × 0.005²) = 0.20 / 0.0025 = 80.
The same function handles any bond once you have the three prices.
def effective_measures(p0, p_down, p_up, dy):
"""p_down is the price after yields fall by dy, p_up after yields rise by dy."""
eff_duration = (p_down - p_up) / (2 * p0 * dy)
eff_convexity = (p_down + p_up - 2 * p0) / (p0 * dy ** 2)
return eff_duration, eff_convexity
def approx_pct_change(duration, convexity, dy):
return -duration * dy + 0.5 * convexity * dy ** 2
dur, conv = effective_measures(100.0, 103.00, 97.20, 0.005)
print(round(dur, 4), round(conv, 4))
# Estimated price change if yields rise 1 percentage point
print(round(approx_pct_change(dur, conv, 0.01) * 100, 2), "%")The output is a duration of 5.8, a convexity of 80.0, and an estimated change of about −5.4% for a 1 percentage point rise. The approximation is −5.8 × 0.01 + 0.5 × 80 × 0.01² = −0.058 + 0.004 = −0.054.
Callable Bonds: Where the Method Matters
Compare a noncallable bond and a callable bond that are otherwise identical, with a 50 bp shift:
| Bond | P0 | P-down | P-up | Effective duration | Effective convexity |
|---|---|---|---|---|---|
| Noncallable | 100.00 | 104.50 | 95.70 | 8.8 | 80.0 |
| Callable | 98.00 | 99.50 | 94.50 | 5.10 | −816.3 |
The callable bond's price rises only from 98.00 to 99.50 when yields fall. The issuer is likely to call near that level, so the price compresses. When yields rise, the call option loses value and the price falls almost as much as for the noncallable bond. The result is a shorter effective duration, and the convexity turns negative.
callable_dur, callable_conv = effective_measures(98.0, 99.5, 94.5, 0.005)
print(round(callable_dur, 3), round(callable_conv, 1))This prints 5.102 and −816.3. The negative sign means the price-yield curve is concave in that region. Duration alone would overstate the gain when yields fall.
How Option Features Shape Effective Duration
- A callable bond has an effective duration at or below that of an otherwise identical noncallable bond. The difference grows as yields fall and the call becomes likely.
- A putable bond has an effective duration at or below that of an otherwise identical nonputable bond. The difference grows as yields rise and the put becomes valuable.
- A callable bond can show negative convexity when yields are low. A putable bond keeps positive convexity.
- A floating-rate note has an effective duration near the time to the next reset, so it is usually small.
- A zero-coupon bond has no uncertainty in its cash flows, so its effective duration is close to its modified duration.
For an option-free bond, effective duration and modified duration are nearly equal. The gap between them is a quick check of how much the option matters.
Common Errors
- Reversing the price inputs. P-down is the price after yields fall, so it is the higher price for a normal bond. If your duration comes out negative on a plain bond, you swapped them.
- Dropping the factor of 2. The denominator is 2 × P0 × dy because the price difference spans two shifts of size dy.
- Using percent instead of decimals. A 50 bp shift is 0.005 in the formula. Entering 0.5 or 50 gives a wrong answer by orders of magnitude.
- Treating a callable bond's modified duration as reliable. The promised cash flows ignore the option, so modified duration can overstate price sensitivity at low yields.
- Mixing curve shifts with yield changes. The estimate −duration × dy applies to a shift of the benchmark curve, and the bond's spread is assumed to stay constant.
- Using a large dy. The formulas are finite-difference estimates. A small dy, commonly 10 to 50 bp, keeps the estimate close to the true slope and curvature.
Connection to the Price Estimate
Once you have effective duration and effective convexity, you use them exactly as you used modified duration and convexity earlier. The estimate of the percentage price change for a benchmark shift dy is:
−(effective duration × dy) + 0.5 × (effective convexity × dy²)
For a callable bond with negative effective convexity, the second term lowers the estimate for both rising and falling yields. For a bond with positive convexity, it raises the estimate in both directions.
Exercise
A bond has a price of 98.00. If the benchmark curve falls by 25 bp, the model price is 99.10. If it rises by 25 bp, the model price is 96.95. Calculate the effective duration and the effective convexity.
Show answer
Here dy = 0.0025. Effective duration = (99.10 − 96.95) / (2 × 98.00 × 0.0025) = 2.15 / 0.49 = 4.39. Effective convexity = (99.10 + 96.95 − 2 × 98.00) / (98.00 × 0.0025²) = 0.05 / 0.0006125 = 81.6.
Exercise
Why is the effective duration of a callable bond usually lower than that of an otherwise identical noncallable bond when yields are low, and what happens to its convexity?
Show answer
When yields are low, the issuer is likely to call the bond, so the price rises less than the noncallable bond's price as yields fall. The smaller price response gives a shorter effective duration. The price gains are capped while the price losses from rising yields are not, so the effective convexity can become negative.
Exercise
A bond's effective duration is 6.0 and its effective convexity is −200. Estimate the percentage price change if the benchmark curve falls by 1 percentage point.
Show answer
dy = −0.01. The change is −6.0 × (−0.01) + 0.5 × (−200) × (−0.01)² = 0.06 − 0.01 = 0.05, or about +5.0%.