Sub topic 12
Acting on results: risk appetite, remediation and reporting
This chapter assumes you can already rate inherent risk, assess controls and derive residual risk, as covered in the earlier chapters. It also assumes you know the basics of customer due diligence and transaction monitoring. Here the focus is on what happens after the numbers exist. A BWRA that ends with a heat map and no decisions has not done its job.
From ratings to decisions
A residual risk rating is an input to decisions. Three decisions follow from it:
- Is the risk within the firm's risk appetite?
- If not, what will be done, by whom and by when?
- Who needs to know, and in what form?
Each decision should be documented, and each should trace back to a specific entry in the risk register.
Risk appetite in practice
Risk appetite is the level and type of money laundering risk the firm is willing to accept in pursuit of its business objectives. The board approves it. A good appetite statement is specific enough to test against BWRA results.
Weak statements say "the firm has a low tolerance for financial crime risk." That cannot be measured. Stronger statements combine a qualitative position with limits:
- The firm does not onboard shell companies with nominee shareholders and no verifiable business purpose.
- Cross-border wire activity involving jurisdictions rated high risk by the firm may not exceed an agreed share of payment volume.
- No residual risk rating of high may remain open for more than a set number of months without board-approved mitigation.
Limits like these are often tracked as key risk indicators (KRIs). A KRI is a metric that signals movement toward or beyond appetite. Examples include the percentage of high-risk customers whose enhanced due diligence is overdue, or the number of alerts older than the service-level target.
Comparing residual risk to appetite
The comparison is usually simple. For each risk, check the residual rating against the appetite threshold for that category. The harder judgement is the edge cases:
- Inherent high, residual medium. This is within appetite only if the controls that justify the reduction are well evidenced. Check that the control assessment holds up.
- Residual low, but a single control carries all the reduction. The rating is fragile. Note the dependency and consider a second layer of control.
- Residual within appetite, but trending worse. Flag it before it crosses the line.
Response options
When a risk is outside appetite, there are four standard responses.
| Response | What it means | Example |
|---|---|---|
| Mitigate | Add or improve controls to lower residual risk | Introduce automated screening of payment messages |
| Avoid | Stop or decline the activity | Exit a correspondent relationship |
| Restrict | Keep the activity within tighter limits | Cap cash deposits for a customer segment |
| Accept | Formally tolerate the risk for a stated period | Board-approved exception while a system is replaced |
Acceptance needs care. It should be a deliberate decision by someone with authority, with a documented reason, a time limit and compensating measures. Unrecorded acceptance, where a known gap is simply left alone, is a common supervisory finding.
Building the action plan
An action plan converts the chosen response into trackable work. Each action should be written so that a reviewer could later say whether it was done.
A usable action has these fields:
- Linked risk ID. The register entry it addresses.
- Specific outcome. "Extend liveness checks to all mobile onboarding channels," not "improve onboarding controls."
- Owner. One named role, not a committee.
- Due date. A real date, with milestones for long projects.
- Expected effect. Which control or rating should change, and by how much.
- Closure evidence. What proves completion, such as a test result or approved procedure.
The register entry from the earlier chapter already carries owner, action and review_date. You can extend it to record closure and the expected rating change.
- id: R-014
action: Extend liveness checks to all mobile channels
action_owner: Head of Retail Onboarding
action_due: 2027-03-31
expected_effect: control_effectiveness moves from partially_effective to effective
closure_evidence: Independent test of liveness checks on all mobile channels
status: in_progress
target_residual_rating: lowPrioritisation
Firms rarely have capacity to fix everything at once. Prioritise using several factors together:
- The size of the gap between residual risk and appetite.
- Whether a regulatory requirement is breached, not just a preference.
- How many risks share the same weak control. Fixing one control may lower several ratings.
- Cost and lead time. Some fixes need new systems and take a year or more.
Where the full fix is slow, set interim measures. For example, if automated monitoring for a product will take a year, manual sampling of that product's transactions can cover the gap in the meantime. Record interim measures as separate actions with their own dates.
Reporting
Different audiences need different views. The same BWRA data is summarised at different levels.
| Audience | Needs | Typical content |
|---|---|---|
| Board | Decide on appetite and resources, and challenge management | Overall risk profile, risks outside appetite, major actions, resource requests |
| Senior management and risk committee | Oversee delivery | Action status, overdue items, KRI trends, dependencies |
| Business line heads | Know what applies to their area | Ratings for their products and customers, their actions |
| Compliance and audit | Test and verify | Full register, evidence, methodology, change history |
Good board reporting is short and decision-oriented. It states the overall profile, what changed since last time, which risks sit outside appetite, what is being done and what the board is asked to approve or decide. A board paper that lists every rating without a request or a conclusion invites passive reading.
Showing movement
Boards need to see change, not only position. A table of the top risks with prior and current ratings makes movement visible. Always explain why a rating moved. A drop from high to medium should name the control improvement that justifies it. An unexplained improvement looks like optimism and will draw challenge.
Tracking and closing the loop
Reporting once is not enough. Actions need to be tracked until they are closed, and closure needs verification.
- Track status. Use a defined set of statuses such as not started, in progress, overdue, closed.
- Escalate overdue actions. Set a rule, for example that actions overdue by more than 30 days go to the risk committee.
- Verify closure. Someone independent of the action owner, such as the second line or internal audit, confirms the evidence.
- Re-rate. Once a control has been improved and tested, update control effectiveness and recalculate residual risk. Do not re-rate on completion of a project alone. A control that is built but not yet operating effectively has not reduced risk.
- Carry forward. Unresolved items and lessons feed into the next BWRA cycle.
Using the scoring example from earlier, a risk with inherent score 16 and control effectiveness 0.5 has residual risk 8, which is medium. Raising effectiveness to 0.8 after a verified improvement gives 3.2, which is low. The recalculation is simple. The discipline is in proving the 0.8.
Common errors
- Results that drive no action. The BWRA is filed and the next year's version looks nearly identical.
- Appetite not linked to ratings. If nobody can say which ratings breach appetite, the board cannot govern.
- Actions without owners or dates. They drift and are repeatedly rolled over.
- Closing on completion, not effect. The work is done but nobody tests whether the control works.
- Optimistic re-rating. Residual risk drops with no new evidence.
- Reporting too much detail upward. Decisions get lost in volume.
Exercise
A BWRA rates cross-border wire transfers as inherent 15 (high), control effectiveness 0.4, giving residual 9 (medium). The board's appetite says no high-rated risk may remain unmitigated. Management proposes to report the risk as within appetite and take no action. A second proposal is to complete a new payment screening project in nine months and then re-rate residual risk to low immediately. Evaluate both proposals and suggest what to do.
Show answer
Residual risk is medium, so the first proposal is consistent with the stated appetite on the numbers. However, the rating depends on a control effectiveness of 0.4, which is low, and the inherent risk is high, so the board should be told the rating relies on weak controls. Management should confirm the 0.4 is evidenced and consider whether the activity deserves an improvement action regardless. The second proposal is wrong on timing. Residual risk should be re-rated only after the screening is live, tested and shown to operate effectively, not when the project completes. A better plan is to log an action with an owner, a due date and closure evidence, set an interim measure such as manual review of higher-value wires during the nine months, report the expected rating change as a target rather than a current rating, and re-rate after independent testing confirms the new control.
Exercise
Name four fields every BWRA action should contain, and explain why closure should be verified by someone independent of the action owner.
Show answer
Any four of: linked risk ID, specific outcome, owner, due date, expected effect, closure evidence. Independent verification matters because owners have an interest in showing completion, and a review by the second line or internal audit reduces the chance that an unfinished or ineffective fix is accepted and used to justify a lower residual risk rating.