Sub topic 3
Decide how long the list should be
This chapter turns your goals and constraints into a number: how many companies belong on the list. You choose the number before you source or score anyone. Sourcing, research and scoring all take time, and the size of the list decides how much of that time each company gets.
I assume you have already written down your goals and constraints, such as your timeline, the hours you can spend each week and your location limits. I also assume you can read short Python functions and use a spreadsheet. The tiers mentioned here (A, B, C) are covered fully in a later chapter. This chapter uses them only to estimate effort.
Why the size matters
A target list fails in two opposite ways.
- Too long. You collect 150 companies. You skim each one and never research any of them properly. Outreach is generic, and the list turns into a bookmark folder you stop opening.
- Too short. You list five companies and stake the whole search on them. If two have hiring freezes and one never replies, the list is empty after a month. A short list also gives you no basis for comparing options.
The right size is the number of companies you can work through at the depth that produces results. Quality of attention is what you are limiting, and the list length follows from it.
The working model: time budget divided by cost per company
Three quantities determine the size.
- Your time budget for the list. Hours per week multiplied by the number of weeks in your search horizon. Only part of your search time goes to the list. Applications, interview preparation and skill work also need hours. A common starting split is 30 to 50 percent for the list.
- The cost of working one company. This covers research, finding contacts, writing outreach, following up and answering replies. It differs a lot by priority. A company you really want deserves hours of attention. A company you only watch needs minutes.
- The mix of priorities. Because cost varies by tier, you need an expected share of companies in each tier. The weighted average cost is the blended cost per company.
The size is then:
list size = time budget for the list / blended cost per companyAll the numbers below are planning assumptions, not measured values. Replace them with your own after the first two weeks, when you know how long a company actually takes you.
A worked calculation
Suppose you can spend 10 hours a week on your job search for 12 weeks, and you give 40 percent of that time to the target list. That is a budget of 48 hours.
Next, estimate effort per company over the whole horizon:
| Tier | Share of list | Hours per company | What the hours cover |
|---|---|---|---|
| A | 15% | 6.0 | Deep research, contact mapping, tailored outreach, follow-ups |
| B | 35% | 2.5 | Moderate research, one or two outreach attempts |
| C | 50% | 0.5 | Basic notes, a check for openings once in a while |
The blended cost is 0.15 × 6.0 + 0.35 × 2.5 + 0.50 × 0.5 = 0.9 + 0.875 + 0.25 = 2.025 hours. Dividing 48 by 2.025 gives about 23.7, so the list holds 23 companies.
Here is the same calculation as code:
HOURS = {"A": 6.0, "B": 2.5, "C": 0.5} # effort per company, by tier
SHARE = {"A": 0.15, "B": 0.35, "C": 0.50} # expected share of the list
def list_size(hours_per_week, weeks, list_fraction=0.4):
"""How many companies fit in the time you can give the list."""
budget = hours_per_week * weeks * list_fraction
blended = sum(SHARE[t] * HOURS[t] for t in HOURS)
return int(budget // blended)
def split(n):
"""Spread n companies over the tiers, with C taking the remainder."""
a = round(SHARE["A"] * n)
b = round(SHARE["B"] * n)
return {"A": a, "B": b, "C": n - a - b}
n = list_size(hours_per_week=10, weeks=12)
print(n, split(n))The output is 23 {'A': 3, 'B': 8, 'C': 12}.
Three A-tier companies may look few. That is intended. A-tier companies take most of your effort, so a handful of them uses up a large share of your hours. In this example the 3 A-tier companies account for 18 of the 48 hours.
Rounding is the reason split gives the remainder to tier C. Rounding every tier independently can make the counts sum to more or less than the list size.
Typical ranges by situation
Use these as a first guess before you do the calculation. They are rules of thumb, and your own time budget should override them.
| Situation | Typical list size | Reasoning |
|---|---|---|
| Urgent search (for example, between jobs, 4 to 8 weeks) | 15 to 25 | Speed matters more than breadth, so you need enough companies to get replies but few enough to contact quickly |
| Active search while employed (3 to 6 months) | 20 to 40 | Fewer hours per week, but a longer horizon to rotate through companies |
| Passive or long-horizon search (a year or more) | 10 to 15 active, plus a watchlist | You can afford deep research, and you want to stay aware of changes without constant effort |
| Career change into a new field | 25 to 40, with more time on research | You need to learn the field's companies, so early research costs more per company |
| Narrow specialty or small region | Whatever exists, often 8 to 15 | The market itself limits the list, and you should not pad it with poor fits |
A larger list is not safer in itself. Hiring decisions depend on timing, internal referrals and budget, so you cannot predict which company will have an opening. A bigger list spreads you across more chances. It also dilutes the attention each chance gets. The time budget is the fixed side of that trade.
Candidate pool versus final list
Do not confuse the pool you source with the list you commit to. Sourcing channels (covered in a later chapter) will give you more names than you can work. A reasonable rule is to source two to three times your target list size, then cut. The cuts come from two steps:
- Must-have filters. Companies that fail a hard requirement, such as remote work or minimum headcount, are removed first. This costs almost nothing per company.
- Scoring. The remaining companies are ranked and the top ones fill the list up to your size.
If your target size is 23, you might source 50 to 70 names. After the filters you may have 35, and after scoring you keep 23. Companies that score just below the line go on a reserve list. They replace companies you drop later (see the chapter on maintenance).
Here is a short check that you can reuse when deciding how many names to source:
def pool_target(list_size, low=2, high=3):
"""Range of names to source so the filters and scoring have room to cut."""
return list_size * low, list_size * high
print(pool_target(23))The output is (46, 69).
How your constraints change the number
The base calculation assumes an average mix. Adjust it when your situation differs.
- Few hours per week. If you can give only 3 to 4 hours, the formula may return fewer than 10 companies. Accept that, and raise the share of C-tier companies only if they cost very little to maintain. Do not squeeze in extra companies at the cost of the A tier.
- Heavy research needed. Regulated industries, research roles and senior positions often need more reading per company. Raise the hours per tier, and the list shrinks.
- Strong networking leverage. If you already know people at many target companies, outreach is cheaper. Lower the hours per company, and the list can grow.
- High-stakes roles. For senior or highly specialized roles, only a few employers exist. A list of 10 well-researched companies may be right, and it is better than a padded list of 30.
- Geographic limits. An on-site requirement in a small city can cap the list. Add remote-friendly companies only if remote work truly fits your goals.
Common errors
- Choosing a round number first. "I'll make it a top 100" ignores your time budget. Calculate the number first, then see if it feels right.
- Using the same effort for every company. If you assume 2 hours for everyone, you underfund your best targets and overfund your weakest. The tier mix is what makes the arithmetic honest.
- Forgetting maintenance time. The list needs regular review (a later chapter covers this). If you spend your whole budget on first-pass research, nothing is left for updates. Keep 10 to 15 percent of the budget in reserve.
- Counting the pool as the list. A spreadsheet with 80 rows, where only 20 have any notes, is really a 20-company list. Be honest about which companies you are actually working.
- Never recalculating. Your hours change when you get interviews or a busy period at work. Recalculate when your weekly hours change by more than a couple of hours.
Handing the number to the next step
The list size feeds directly into tiering. When you reach that chapter, you will use thresholds on your scores to assign tiers. You can also set the tier counts first, for example 3 A, 8 B and 12 C, and let the scores decide who fills each slot. Either way, the size from this chapter is a constraint on the result. If many companies score above the A threshold, you do not promote all of them. You keep the A tier to the number your time can support.
Summary of the method
- Compute your list time budget: hours per week × weeks × list share.
- Estimate hours per company for each tier and the expected tier mix.
- Divide the budget by the blended cost, and round down.
- Compare the result to the range for your situation. If it is far outside, check your assumptions.
- Source two to three times that number, then filter and score down to it.
- Keep a reserve list, and recalculate when your hours change.
Exercise
You have 6 hours per week for 10 weeks and plan to give 50% of that time to the list. Using the tier shares and hours from this chapter (A: 15% at 6.0 hours, B: 35% at 2.5 hours, C: 50% at 0.5 hours), how many companies should the list hold? How many names should you source if you want a pool of 2 to 3 times that size?
Show answer
The budget is 6 × 10 × 0.5 = 30 hours. The blended cost is 2.025 hours per company. 30 / 2.025 is about 14.8, so the list holds 14 companies (rounding down). The pool should be 28 to 42 names.
Exercise
A colleague says, "My list has 60 companies, but I only have notes on 15 of them and I have contacted 4." What is the size of the list in practice, and what should they do?
Show answer
The working list is about 15 companies, and only 4 are active. The other 45 are an unworked pool. They should calculate a size from their time budget, keep the best-scoring companies up to that number, and move the rest to a reserve list or drop them.
Exercise
Your calculation gives 23 companies, but this week you will get 3 fewer hours because of a work deadline that lasts a month. Which option fits the chapter's method: add more C-tier companies, or recalculate and move some companies to a watchlist? Explain briefly.
Show answer
Recalculate and move some companies to a watchlist. Less time means a smaller budget, so the same blended cost supports fewer companies. Adding C-tier companies would not help, because every company still takes some time, and it would take attention away from the A tier.