Sub topic 18
Common Mistakes and a Final Checklist
This chapter assumes you have read the earlier chapters and have a full draft: problem through ask, formatted for both emailing and presenting. You should also know the terms burn, runway, dilution, and pre-money valuation. The goal here is to review the draft the way a skeptical investor would, find the errors that cost you a second meeting, and fix them before you send anything.
Why the same mistakes keep appearing
Investors skim a deck in a few minutes and look for reasons to stop. Most rejections at this stage come from a small set of repeated errors. They fall into three groups: the story does not hold together, the numbers do not survive a check, and the slides are hard to read. Each group is easier to catch with a specific test than with a general feeling that the deck "needs polish".
Mistakes in the story
No single message
A deck that tries to say five things leaves the reader with none. If three people read your deck and describe the company differently, the core message is missing. The test: close the deck and write one sentence stating what the company does, for whom, and why it will win. Every slide should support that sentence.
A problem that nobody feels
"Companies waste time on reporting" is a topic, not a problem. A checkable problem names who has it, how often, and what it costs them. Compare "finance teams at 50 to 200 person companies spend two days each month reconciling invoices by hand" with the vague version. The first can be verified in customer calls. The second cannot.
The pitch instead of the product
Slides with adjectives such as "seamless", "revolutionary", and "AI-powered" tell the reader nothing. Replace each adjective with a screenshot, a number, or a named customer action.
A "why now" that is really "why not earlier"
"The market is growing" is true of nearly every market. A real why-now names a specific change, such as a regulation taking effect, a cost falling by a stated amount, or a platform opening its API, and connects it to your product.
Mistakes in the numbers
Top-down market sizing only
"Our market is $50 billion, and we need only 1%" is the most recognized weak argument in pitching. Show the bottom-up calculation instead: reachable customers multiplied by what each pays. Put the assumptions on the slide so an investor can challenge them.
target_accounts = 12_000 # companies that fit the ideal customer profile
annual_contract_value = 9_000 # average yearly price per account in dollars
bottom_up_market = target_accounts * annual_contract_value
print(f"Bottom-up market: ${bottom_up_market:,} per year")This prints Bottom-up market: $108,000,000 per year. A smaller number with visible inputs is more credible than a large number with none.
Traction described with adjectives
"Strong early interest" and "growing quickly" are claims without evidence. Use the metric, the period, and the base: "revenue grew from $6,000 to $21,000 monthly between March and August." If the base is small, say so. Investors will find it anyway.
An ask that does not follow from the plan
The ask should come from burn, target runway, and the milestones the money unlocks. A round size picked because a competitor raised it will not survive the question "what does this get you?" Check the arithmetic, including the dilution it implies.
Inconsistent numbers across slides
A revenue figure on the traction slide that differs from the one in the financial plan is a more serious error than a weak slide. It suggests the founders do not track their own data. Build all numbers from one source and update them together.
Mistakes in design and delivery
- Too much text. If a slide needs more than about a minute to read, split it or cut it.
- Tiny charts. Axis labels that cannot be read on a laptop screen at normal zoom will not be read.
- Different decks for different uses mixed together. A presented deck with sparse slides, emailed alone, leaves gaps. An emailed deck packed with detail, presented live, loses the room. Keep the two variants separate, as covered earlier.
- Hiding the ask. If the amount and use of funds appear only on the last slide with no mention earlier, a skimming reader may never reach it. State the round in the email or on the title slide.
- Ignoring feedback patterns. One investor's objection is an opinion. The same objection from three investors is a defect in the deck.
Mistakes at a glance
| Mistake | What the investor concludes | Fix |
|---|---|---|
| Top-down market only | Founders have not talked to customers | Bottom-up calculation with visible inputs |
| Adjectives in place of metrics | Evidence is thin | Metric, period, and base |
| Round size without a plan | Ask is arbitrary | Derive from burn, runway, and milestones |
| Slides disagree on numbers | Data is not tracked | One source of truth |
| Vague why-now | Timing is a guess | Name the specific change |
| Wall of text | Deck will not be read | One idea per slide |
Check the ask before you send
The ask is the easiest part to verify mechanically. The script below derives the raise from burn and runway, computes dilution at your assumed pre-money valuation, and flags two common problems: a runway too short to reach the milestone with a buffer, and dilution above a limit you choose.
def check_ask(monthly_burn, runway_months, pre_money,
milestone_months, buffer_months=6, max_dilution=0.25):
raise_amount = monthly_burn * runway_months
post_money = pre_money + raise_amount
dilution = raise_amount / post_money
warnings = []
if runway_months < milestone_months + buffer_months:
warnings.append(
f"Runway of {runway_months} months leaves less than "
f"{buffer_months} months of buffer after the "
f"{milestone_months}-month milestone."
)
if dilution > max_dilution:
warnings.append(
f"Dilution {dilution:.1%} exceeds your limit of {max_dilution:.0%}."
)
print(f"Raise: ${raise_amount:,} Dilution: {dilution:.1%}")
for w in warnings:
print("WARNING:", w)
if not warnings:
print("No warnings.")
check_ask(
monthly_burn=80_000,
runway_months=18,
pre_money=8_000_000,
milestone_months=12,
)With these inputs it prints Raise: $1,440,000 Dilution: 15.3% and No warnings. Change milestone_months to 15 and the buffer warning appears. The 6-month buffer and 25% limit are placeholders. Set them from your own plan and advice, not from this example.
The final review sequence
Run the review in order. Fixing design before the story is settled wastes effort.
Final checklist
- The one-sentence message is written down, and each slide supports it.
- The problem names who has it, how often, and what it costs.
- The solution slide shows the product with a screenshot or a real workflow.
- The why-now names one specific change.
- Market size is bottom-up, with every assumption visible.
- Pricing, who pays, and the main unit economics are stated, with sources.
- Traction gives metrics with period and base, not adjectives.
- Competition lists real alternatives, including doing nothing, and an honest difference.
- Team members are tied to this specific problem.
- The ask states amount, runway, milestones, and use of funds, and the math is checked.
- Every number that appears twice is identical.
- Each slide can be read in under a minute at normal zoom.
- The emailed version stands alone, and the presented version has speaker notes.
- Two outside readers have skimmed it, and repeated objections are fixed.
Exercise
Your deck says the market is "$30 billion, and we only need 0.5%." Your ideal customer profile is 8,000 companies paying an average of $12,000 per year. Rewrite the claim as a bottom-up figure, and name one assumption an investor is likely to challenge.
Show answer
Bottom-up market = 8,000 x $12,000 = $96,000,000 per year. Replace the top-down claim with that figure and show both inputs on the slide. An investor is likely to challenge the count of 8,000 reachable companies, or whether the average price of $12,000 holds for every segment. Cite how you counted the accounts and how many customers currently pay that price.