Sub topic 2
Adding wastage and allowances
This chapter assumes you can read a garment BOM, work with percentages, and run a short Python script. It shows how to turn net consumption into the quantity you buy, then into a cost sheet.
Adding wastage and allowances
Net consumption is the fabric or trim that ends up in the finished garment. Real orders need more. Cutting leaves offcuts, fabric shrinks, and some rolls are flawed. A wastage allowance adds a percentage to the net quantity:
gross quantity = net quantity × (1 + wastage)
For 1.40 m of twill with 5% wastage, the gross quantity is 1.47 m. Other allowances, such as a pattern-matching allowance, use the same formula.
Pricing materials: suppliers, MOQs and currency
A supplier quote gives a unit price, a minimum order quantity (MOQ) and a currency. Price the gross quantity first, then check whether the MOQ forces a larger order. If you need 40 m of fabric with a 100 m MOQ, you pay for 100 m. The 60 m surplus is stock, not garment cost. Convert every price to one currency before you add the lines, and record the exchange rate and its date on the cost sheet.
CMT and labour costing
Cut-make-trim (CMT) is the factory charge for cutting, sewing and finishing a garment, excluding materials. Check its scope. Some quotes exclude washing, embroidery or packing, and comparing quotes with different scope gives wrong answers.
Assembling the cost sheet
The cost sheet adds the material lines and CMT to reach an FOB (free on board) cost, which is the price at the port of loading.
fx_rate = 1.08 # USD per EUR, assumed for this example
# item, unit, net qty per garment, wastage, unit price, currency
bom = [
("Cotton twill", "m", 1.40, 0.05, 6.00, "USD"),
("Zip", "pc", 1, 0.02, 0.40, "USD"),
("Label", "pc", 1, 0.02, 0.10, "EUR"),
]
cmt = 4.50 # USD per garment
materials = 0.0
for item, unit, qty, wastage, price, cur in bom:
gross = qty * (1 + wastage)
usd_price = price * (fx_rate if cur == "EUR" else 1.0)
line = gross * usd_price
materials += line
print(f"{item:<14} {gross:6.3f} {unit:<2} x {usd_price:5.2f} = {line:6.3f}")
fob = materials + cmt
print(f"Materials {materials:.2f} CMT {cmt:.2f} FOB {fob:.2f}")Exercise
A garment uses 2.00 m of lining with a 4% wastage allowance. What quantity should the BOM order?
Show answer
2.08 m, because 2.00 × 1.04 = 2.08.