This chapter assumes you already group tasks into batches and give each batch a time block. It also assumes you know your own recurring work, such as email, admin, meetings and focused work. Here you will check whether your batches work and change them based on what you see.
Why a batching routine needs a review
A batching plan is a guess. You guessed how long email takes, how often admin piles up, and how many interruptions you would get. Real days differ from the guess. A short review turns the plan into something that fits your work.
Review on a fixed schedule. A weekly check of 10 minutes is enough for most people. Without a set time, the review gets skipped on busy weeks, which are the weeks you most need it.
What to track
Track a few simple numbers for each batch. Keep the notes small, or you will stop writing them.
| Measure | How to record it | What it tells you |
|---|---|---|
| Planned minutes | The length of the time block | Your estimate |
| Actual minutes | Start and end time of the session | Whether the block is the right size |
| Tasks finished and deferred | A count at the end of the session | Whether the batch is too big |
| Interruptions | A tally mark for each one | Whether the session is protected |
| Waiting time | Days from a task arriving to its batch | Whether the batch runs often enough |
You can keep this in a notebook or a spreadsheet. If you prefer code, the script below compares planned and actual minutes for each batch and flags the ones that miss.
sessions = [
{"batch": "email", "planned": 30, "actual": 45, "interruptions": 3},
{"batch": "email", "planned": 30, "actual": 40, "interruptions": 2},
{"batch": "admin", "planned": 45, "actual": 40, "interruptions": 0},
{"batch": "admin", "planned": 45, "actual": 50, "interruptions": 1},
]
totals = {}
for s in sessions:
t = totals.setdefault(s["batch"], {"planned": 0, "actual": 0, "interruptions": 0, "count": 0})
t["planned"] += s["planned"]
t["actual"] += s["actual"]
t["interruptions"] += s["interruptions"]
t["count"] += 1
for batch, t in totals.items():
overrun = (t["actual"] - t["planned"]) / t["planned"] * 100
flag = "REVIEW" if abs(overrun) > 20 else "ok"
print(f"{batch}: {overrun:+.0f}% vs plan, {t['interruptions']} interruptions in {t['count']} sessions, {flag}")In this sample, email runs 42% over plan, so it is flagged. Admin runs 6% over and passes.
Reading the signals
Each pattern points to a likely cause and a change.
- Sessions run long. Either the estimate was low or the batch holds too much. Raise the block length, or move some tasks to the next session.
- Sessions end early. The block is too long. Shorten it, or merge it with a related batch.
- Many deferred tasks. The batch is too big for its block. The second code example in the sizing chapter shows how a block limit pushes tasks to the next session.
- Many interruptions. The session is not protected. Silence notifications, close the tools you do not need, or move the block to a quieter hour.
- Tasks wait too long. The batch runs too rarely. Add a second session or move an urgent type out of batching.
- You dread or skip a batch. The time of day may clash with your energy. Try moving it.
Change one thing at a time
If you change the block length, the start time and the batch contents together, you will not know which change helped. Change one setting, run it for a week or two, then look at the numbers again.
Pick the change with the best payoff first. A batch that overruns by half its plan or loses many tasks to deferral usually comes first.
Knowing when to drop a batch
Some batches do not earn their place. Remove or merge one when it stays small, such as two tasks a week, or when it keeps colliding with urgent work. A batch with a low task count may work better as part of a neighbouring batch. A batch that is always interrupted may be a sign that the work is urgent and does not suit batching, as the chapter on when not to batch describes.
A worked example
A manager batches email twice a day for 30 minutes each. After two weeks the log shows:
- Sessions average 45 minutes.
- About four messages per session need a quick reply that takes under two minutes.
- Two colleagues have said replies feel slow.
The manager makes one change first: the block grows to 45 minutes, since the estimate was simply wrong. A week later, sessions finish on time. The manager then deals with the slow replies by adding a short third check at 15:30. Each fix addresses one signal.
Exercise
A weekly admin batch has a 45-minute block. Over three weeks the sessions took 44, 46 and 45 minutes, but 5, 6 and 4 tasks were deferred each time. What does this suggest, and what is one change you could make?
Show answer
The block length is accurate, since sessions match the plan, but the batch holds more work than the block can fit. Make one change: either lengthen the block, run the batch more often, or move some tasks to another batch. Change only one, then review again after a week or two.
Exercise
Why should you wait for more than one session before changing a batch?
Show answer
One session can be distorted by a single event such as an outage or a deadline. A pattern across several sessions shows a real problem with the batch.