Sub topic 9
Reviewing Results and Adjusting Your Batches
This chapter assumes you have already grouped tasks into batches and put them in time blocks. It also assumes you can read a short Python script, though the review method works with a paper log. The goal is to turn a batching routine you started once into one that keeps working as your workload changes.
A batching setup is a hypothesis
When you create a batch such as "email, 30 minutes, 9:00 and 15:00", you are making a prediction. You are predicting that these tasks belong together, that 30 minutes is enough, and that the session will be quiet. Your first setup is usually wrong in at least one of these ways.
Most people don't review. They notice that a batch feels bad, then drop the whole method or keep following a schedule that no longer fits. A short review lets you change one part of the setup based on evidence instead.
Review also catches slow decay. A batch that worked in March can fail by June because your inbox volume grew, a colleague moved to another time zone, or a project ended. Without a regular check, the failure shows up as a vague feeling that "batching doesn't work for me."
What to record
Record only what you can capture in under a minute per session. Five fields cover most of what you need to judge a batch.
| Field | What it tells you | How to capture it |
|---|---|---|
| Planned minutes | The size of the time block | Copy from your calendar |
| Actual minutes | Whether the block fits the work | Note the start and end times |
| Tasks done | Throughput | Count items finished |
| Tasks deferred | Whether the batch is too large | Count items pushed to the next session |
| Interruptions | Whether the session was protected | Tally each time you left the batch task |
Two optional fields are worth adding if you have the patience. One is the age of the oldest waiting item, which shows when a batch is too infrequent. The other is a 1 to 5 rating of how the session felt, which captures quality that counts cannot.
What not to measure
Avoid measuring output per minute as a goal. If you reward yourself for finishing more emails per minute, you will write shorter and sloppier replies. Counts are there to diagnose the setup, not to grade you. A session with few tasks done can be a good session if those tasks were hard ones.
Turning a log into signals
You can keep the log as a spreadsheet or a plain CSV file. The script below reads a small log, groups rows by batch, and applies simple rules. The thresholds are starting points that you should tune after a few weeks.
import csv
import io
from collections import defaultdict
LOG = """date,batch,planned_min,actual_min,tasks_done,tasks_deferred,interruptions
2026-11-02,email,30,45,12,0,3
2026-11-02,deep_work,90,60,2,1,5
2026-11-03,email,30,40,10,2,2
2026-11-03,admin,45,40,6,0,0
2026-11-04,email,30,50,14,1,4
2026-11-04,deep_work,90,55,1,2,6
2026-11-05,admin,45,42,5,1,1
2026-11-06,deep_work,90,70,2,1,4
2026-11-07,admin,45,38,7,0,0
"""
def summarize(log_text):
totals = defaultdict(lambda: defaultdict(int))
for row in csv.DictReader(io.StringIO(log_text)):
t = totals[row["batch"]]
t["sessions"] += 1
for key in ("planned_min", "actual_min", "tasks_done",
"tasks_deferred", "interruptions"):
t[key] += int(row[key])
return totals
def diagnose(t):
ratio = t["actual_min"] / t["planned_min"]
per_session = t["interruptions"] / t["sessions"]
attempted = t["tasks_done"] + t["tasks_deferred"]
deferral = t["tasks_deferred"] / attempted if attempted else 0.0
notes = []
if ratio > 1.25:
notes.append("overrun: shrink the batch or lengthen the block")
elif ratio < 0.75:
notes.append("ended early: the block is too long or the session is cut off")
if per_session >= 3:
notes.append("interrupted: protect the session")
if deferral >= 0.25:
notes.append("too many tasks: split the batch")
return ratio, per_session, deferral, notes
for batch, t in summarize(LOG).items():
ratio, per_session, deferral, notes = diagnose(t)
print(f"{batch}: used {ratio:.0%} of plan, "
f"{per_session:.1f} interruptions/session, {deferral:.0%} deferred")
for note in notes or ["no flags"]:
print(f" -> {note}")Running it prints:
email: used 150% of plan, 3.0 interruptions/session, 8% deferred
-> overrun: shrink the batch or lengthen the block
-> interrupted: protect the session
deep_work: used 69% of plan, 5.0 interruptions/session, 44% deferred
-> ended early: the block is too long or the session is cut off
-> interrupted: protect the session
-> too many tasks: split the batch
admin: used 89% of plan, 0.3 interruptions/session, 5% deferred
-> no flagsThe three results show three different situations. The admin batch is healthy, so leave it alone. The email batch runs 50% over its block while being interrupted. The deep work batch ends early, is interrupted, and defers almost half its tasks, so it fails on every measure.
Notice that the deep work flags point in different directions. "Ended early" suggests a shorter block, while "too many tasks" suggests fewer tasks. Those are not contradictory. The session is being cut short by interruptions, so tasks are left undone even though time was available. The interruptions are the cause, and the other two flags follow from them.
The review loop
Run the same loop each time you review. The order matters, because it stops you from changing things before you know what is wrong.
Weekly and monthly rhythm
A weekly review of 10 to 15 minutes is enough to read the flags and spot problems. Put it in a time block of its own, ideally at the end of the week when the log is fresh. A monthly review is a good point to ask larger questions. Is each batch still necessary? Has a new kind of recurring task appeared that deserves its own batch? Have your peak energy hours moved?
Reading symptoms and choosing a change
Each symptom has several possible causes, and the cause decides the fix. The table maps the common ones.
| Symptom | Likely causes | Adjustment to try first |
|---|---|---|
| Session overruns its block | Block too short, too many tasks, tasks poorly estimated | Cap the batch with a task or time limit, as in the `fill_block` idea from earlier chapters |
| Session ends early with time left | Block too long, batch too small | Shorten the block or merge with a related batch |
| Many deferred tasks, every session | Batch too large for the block | Split the batch or raise the block length |
| High interruption count | Notifications on, shared space, colleagues expect instant replies | Silence alerts, move location, tell people when you will reply |
| Oldest waiting item keeps growing | Batch too infrequent | Add a second session per day or week |
| Sessions feel like a chore, low rating | Wrong time of day, or mixed mindsets in one batch | Move to a better energy slot or split by mindset |
| Urgent items bypass the batch often | The batch contains work with real deadlines | Move those tasks out of the batch (see the chapter on when not to batch) |
Make one change at a time
If you shorten the block, move the time slot, and turn off notifications all in one week, you will not know which change helped. Pick the single most likely cause and change only that. Then run the trial for a fixed period, usually two weeks, before judging.
Two weeks is a compromise. One week is too noisy, because a single bad day can distort the numbers. A month is slow if the change was a poor guess.
Sample size matters
The example log above has only three sessions per batch. That is enough to see a pattern when it is large, such as 150% of plan, but not enough to be sure about a smaller one. A 30% deferral rate from 10 tasks is three tasks. One unusual day can produce that. Treat flags from small samples as questions to watch, not as conclusions.
Common errors in reviewing
Changing the schedule when the problem is the batch
Suppose your email batch overruns. You might move it to a different hour. If the real cause is that the batch includes slow, thoughtful replies, a new hour won't help. Move the thoughtful replies into a deep work or "responses" batch and keep the quick triage in the email batch.
Treating interruptions as a personal failing
A high interruption count is information about your environment. Look at where they come from. Count them by source for one week: chat, phone, people walking up, your own urge to check something. The source decides the fix. Self-interruptions call for a parking list, where you write the idea down and return to it. External interruptions call for an agreement with other people or a change of location.
Ignoring the cost of the waiting queue
Batching moves delay from you to the people waiting on you. Your review should include their side. If a colleague waits five hours for replies that would take you one minute, ask whether that is acceptable for your role. If not, shorten the gap between sessions even if it costs some efficiency. The same reasoning applies to the age of the oldest waiting item.
Optimizing the numbers instead of the work
Once you track "tasks done," it is tempting to split large tasks into tiny ones to increase the count, or to defer hard tasks to protect your completion rate. Watch for deferral patterns by task, not just by batch. If the same task is deferred every session, it probably does not belong in a batch at all. It may need its own protected block, or it may be a task you should drop or delegate.
Abandoning a batch too early
New routines have a start-up cost. Your first two weeks usually look worse than your fourth, because you are still learning how long things take. Give a new batch at least two review cycles before deciding it does not work, unless it is clearly harmful, such as causing missed deadlines.
Edge cases
- Variable workloads. If your volume swings widely, such as a busy month-end, compare a batch against its own earlier busy periods. Do not compare it against an average. Consider a lighter and a heavier version of the same batch and switch between them.
- Team and shared schedules. If a batch depends on other people's availability, such as a weekly one-to-one meeting round, your changes may need their agreement. Record this in the review as a constraint instead of a failure.
- Batches that work but are unnecessary. A batch can show clean numbers because the task itself has faded away. If a monthly review shows a batch handling two tasks a week, merge it into another batch and free the block.
- Illness, travel, and holidays. Mark these sessions in your log and exclude them from the analysis. Otherwise a week away will trigger false flags.
- Missing data. If you skip logging for a few days, do not fill in guesses. Leave the gap. Guessed numbers hide the exact patterns you are trying to find.
Putting it together
A practical review has four parts. First, collect the numbers for each batch. Second, read the flags and look for the cause behind each one. Third, change one thing and give the change two weeks. Fourth, decide whether to keep or revert it, and write down what you learned so you do not repeat the experiment.
Your batching routine is never finished. Treat it as a draft that you edit each week, with each edit based on what happened and not on what you hoped would happen.
Exercise
A log shows your "calls" batch used 60% of its planned time, had 0.5 interruptions per session, and deferred 5% of tasks across six sessions. Which change would you try first, and why?
Show answer
Shorten the block, for example from 60 to about 40 minutes. The low interruption rate and low deferral rate show that the session is protected and the tasks fit, so the extra time is unused. Change only the block length, then watch the next two weeks to confirm that the ratio rises toward 100% without more deferrals.
Exercise
Your email batch shows 4.5 interruptions per session and 30% of tasks deferred. A friend suggests splitting the batch into two smaller ones. Why might that be the wrong first change?
Show answer
The deferrals are probably a result of the interruptions, because time is lost whenever you leave the batch task. Splitting the batch treats the symptom. The first change should target the interruptions, for example by silencing chat alerts or moving to a quiet place. After two weeks, check whether the deferral rate falls on its own before changing the batch size.
Exercise
You made three changes at once last week (moved the time slot, shortened the block, and turned off notifications), and the batch improved. What problem does this create, and how would you handle it next time?
Show answer
You cannot tell which change caused the improvement, so you cannot be sure which to keep if one has a cost, and you cannot reuse the lesson elsewhere. Next time, make one change, run it for two weeks, then keep or revert it before trying the next change.