Sub topic 11
Checking whether the cuts worked
This chapter assumes you have already run a trial period and have a meeting inventory CSV with the columns title, duration_minutes, attendees and occurrences_per_year. You should also be able to read a short Python script.
Why measure at all
A cut that looks good on the calendar can fail in practice. People may recreate the meeting informally, or decisions may slow down. Measuring tells you whether to keep the change, adjust it, or reverse it.
Check two kinds of evidence: how much time you freed, and whether the work still goes well.
Measure the time saved
Use the same calculation for the baseline and the result. Take the baseline from the inventory you built before the trial. Export a second inventory after the trial ends, using the same rules, and compare the two.
import csv
def total_hours(path):
total = 0.0
with open(path, newline="") as f:
for row in csv.DictReader(f):
minutes = int(row["duration_minutes"])
attendees = int(row["attendees"])
per_year = int(row["occurrences_per_year"])
total += minutes / 60 * attendees * per_year
return total
HOURLY_RATE = 60.0 # assumed blended cost per person-hour; replace with your own figure
before = total_hours("meetings_before.csv")
after = total_hours("meetings_after.csv")
saved = before - after
share = saved / before if before else 0.0
print(f"Before: {before:.0f} person-hours/year")
print(f"After: {after:.0f} person-hours/year")
print(f"Saved: {saved:.0f} person-hours/year ({share:.0%}), about {saved * HOURLY_RATE:,.0f} per year")Compare calendar data with calendar data. Do not compare a plan with what actually happened. If the trial moved a status meeting to a written update, also count the time people spend writing and reading it. A saving of 5 hours in meetings that costs 2 hours of reading is a saving of 3 hours.
Measure the effect on the work
Time saved only counts if the purpose of the meeting is still met. Go back to the purpose and expected outcome you wrote down for each meeting, and check them with a few signals.
| Signal | How to check | Warning sign |
|---|---|---|
| Decisions | Count decisions made in the thread or call compared with the last quarter | Decisions are slower or are not being made |
| Surprises | Count issues that surfaced late and that the old meeting would have caught | More late surprises than before |
| Replacement meetings | Search the calendar for new ad hoc invites on the same topic | The meeting came back under a different name |
| Participant view | Ask the affected people two or three short questions | Several people say they miss information |
| Async uptake | Check whether written updates are posted on time and read | Updates are late or ignored |
Review loop
Interpreting the results
Use these rules when the results are mixed:
- If time is saved and the work signals are healthy, make the change permanent and record the saving.
- If time is saved but surprises are rising, adjust the change. Add a short fortnightly call, or shorten the meeting instead of cancelling it.
- If the meeting reappeared in another form, you have not saved the time. Either bring the real meeting back, or deal with the need that created the new one.
- If you cannot tell, extend the trial by a few weeks rather than guessing.
Report the numbers in the same form as the inventory: person-hours per year, then money. That keeps results comparable at the next audit.
Exercise
Your baseline inventory shows 400 person-hours per year. After the trial, the meeting inventory shows 250. Your team now spends about 40 person-hours per year writing and reading written updates. At 60 per person-hour, what is the net annual saving in hours and money?
Show answer
The meeting saving is 400 - 250 = 150 hours. Subtract the 40 hours of new async work to get a net saving of 110 person-hours per year. At 60 per hour, that is about 6,600 per year.
Exercise
The trial is over and meeting time has dropped by 30%. However, three new ad hoc calls on the same topic appeared on the calendar, and two people report missing information. Should you make the change permanent?
Show answer
No. The work signals are unhealthy: new replacement meetings and reported information gaps mean the purpose of the old meeting is not fully met. Adjust the change, for example with a shorter or less frequent meeting, and run another trial.