Checking whether the cuts worked
This chapter assumes you have already run an audit, chosen an action for each meeting, announced the changes and completed a trial period. You should be comfortable reading a short Python script and working with a calendar export in a spreadsheet. Here you learn how to decide whether the changes delivered what you expected, and what to do when the numbers are unclear.
Why you need to measure
A cut that feels successful may not be. People remember the meeting they no longer attend, but they forget the extra messages, the ad hoc calls and the delays that replaced it. Measuring gives you evidence in three situations:
- You can show stakeholders that the trial saved time, which makes the change easier to keep.
- You can catch a change that backfired before it becomes permanent.
- You can tell which actions (cancel, shrink, replace with an async update) work best on your team, and use that in the next audit.
Measurement here does not need to be elaborate. Use a few numbers you can collect again each time, and compare them with a baseline you recorded before the change.
Record a baseline before you change anything
You can only measure a change against something. The baseline is the set of numbers from the inventory you built earlier in this tutorial. For each meeting you changed, keep these values:
- Duration in minutes, attendees and occurrences per year.
- Annual person-hours, from the cost calculation.
- The expected outcome you named for the meeting, such as "decide which tickets go into the sprint."
If you did not save the baseline, rebuild it from calendar history for the weeks before the trial began. Calendars usually keep past events, so you can still export them. Use at least four weeks of history so one unusual week does not skew the figures.
Two kinds of measures
Separate what you can count from what you have to ask.
| Kind | Examples | Source |
|---|---|---|
| Quantitative | Person-hours per year, meeting hours per person per week, number of recurring meetings, average attendees | Calendar export |
| Qualitative | Whether decisions still happen on time, whether people feel informed, whether work was blocked | Short survey or conversations |
The quantitative measures tell you how much time you recovered. The qualitative measures tell you whether the recovery cost anything. You need both. A large time saving with a drop in clarity is not a success.
Measure the time saved
Reuse the cost script from the earlier chapter on turning the list into person-hours. Run it on the old inventory and on a new export taken after the trial. Then compare the two. The script below reads both files and prints the change per meeting.
import csv
from collections import defaultdict
HOURLY_RATE = 60.0 # assumed blended cost per person-hour; replace with your own figure
def annual_hours(path):
totals = defaultdict(float)
with open(path, newline="") as f:
for row in csv.DictReader(f):
minutes = int(row["duration_minutes"])
attendees = int(row["attendees"])
per_year = int(row["occurrences_per_year"])
totals[row["title"]] += minutes / 60 * attendees * per_year
return totals
before = annual_hours("meetings_before.csv")
after = annual_hours("meetings_after.csv")
total_saved = 0.0
for title in sorted(before):
saved = before[title] - after.get(title, 0.0)
total_saved += saved
status = "cancelled or replaced" if title not in after else "changed"
print(f"{title}: {saved:.0f} person-hours saved per year ({status})")
new_titles = sorted(set(after) - set(before))
for title in new_titles:
print(f"NEW: {title}: {after[title]:.0f} person-hours per year")
total_saved -= after[title]
print(f"Net saving: {total_saved:.0f} person-hours/year, about {total_saved * HOURLY_RATE:,.0f} per year")Two details in this script matter.
First, it subtracts the cost of any new meeting that appears in the "after" file. If you cancelled a weekly status meeting and someone created a "quick sync" in its place, the saving shrinks. Counting only the meetings you removed would overstate the result.
Second, it treats a title missing from the "after" file as cancelled or replaced. That is only true if titles did not change. If someone renamed a meeting, it will show up as both a cancellation and a new meeting. The net total is still correct, but the per-meeting lines will mislead you, so check them by hand.
Convert hours into something people understand
Person-hours per year is a precise figure but an abstract one. Two conversions help:
- Divide the net saving by the number of people on the team to get hours per person per year. Divide again by roughly 45 working weeks to get hours per person per week.
- Compare the money figure with something the audience cares about, such as the cost of a tool or a part-time role. State the rate you assumed so nobody mistakes the figure for payroll data.
The money figure is an estimate. It assumes the freed time is spent on work worth the same as the hourly rate, which is not always true. Present it as the size of the opportunity, not as cash returned to the budget.
Measure what replaced the meeting
Cutting a meeting often moves work somewhere else. Look for these replacements:
- Messages. A written update replaces a meeting, but the channel may fill with follow-up questions. Count the messages in the thread during the trial and compare them with a normal week.
- Ad hoc calls. People who miss the old meeting may book short calls to get the same information. Check the calendar for new one-off events between the same people.
- Time to read. An async update that takes 20 minutes to write and 5 minutes to read for each of six people costs 50 minutes in total. That is still better than a 45-minute meeting with six people only if the written update also replaces other effort. Count both sides.
Add these hidden costs to the net saving. If a replacement costs more than half of what you saved, reconsider the change.
Measure the outcomes
Time saved matters only if the work the meeting supported still gets done. Go back to the expected outcome you named for each meeting and ask whether it still happens.
Useful checks include:
- Decision delay. How long did decisions take before, and how long during the trial? Look at a few real decisions in tickets or documents.
- Blocked work. Did anyone wait for information or approval that the meeting used to provide? Ask people directly.
- Surprises. Did anyone learn of a change late, or miss a risk? A single serious surprise is worth more attention than a small average gain.
- Attendee sentiment. A short, anonymous survey with two or three questions is enough. For example, "I have the information I need to do my work" on a scale of 1 to 5, asked before and after.
Keep the survey short and repeat the same wording each time, so the answers are comparable. With small teams, a few conversations may tell you more than a survey. With fewer than ten responses, treat percentages with caution, because one person's answer moves the result a great deal.
Read the results honestly
The numbers rarely point in a single direction. Use the following table to interpret common combinations.
| Time saved | Outcomes | Reading | Suggested action |
|---|---|---|---|
| High | Unchanged or better | The cut worked | Make it permanent |
| High | Worse | You cut something with real value | Restore part of it, for example a shorter or less frequent meeting |
| Low | Unchanged | The change was too small to matter | Look for a larger cut elsewhere |
| Low | Worse | The change did harm without benefit | Revert |
| Replaced by new meetings | Any | Work moved, not removed | Address the replacement meetings |
Be careful about two biases. The first is novelty. People are often enthusiastic in the first weeks of any change, and the effect may fade. The second is the timing of the trial. A trial that runs over a holiday period or a product launch will not represent a normal month. Note any unusual events in the trial period so you can discount them.
Decide what to do next
The trial review ends in one of four decisions for each changed meeting.
- Keep the change. The saving is real and outcomes held. Update the calendar so the new format is the default.
- Adjust it. The idea was right but the setting was wrong. For example, a monthly meeting may work where a quarterly one left gaps.
- Revert it. The cut caused more cost than it saved. Reverting is not a failure. It is information about the meeting's real value.
- Extend the trial. The data is too thin or the period was unusual. Set a new end date, so the trial does not drift indefinitely.
Write the decision and the numbers behind it in one place, such as a shared note. When the next audit comes around, you will have a record of what you tried and what happened.
Common errors when measuring
- No baseline. Without a before figure, any claim of savings is a guess. Save the inventory before you begin.
- Counting scheduled time instead of actual time. An invite may say 60 minutes while the meeting ended after 40. If you can, use real durations for the largest meetings, but keep the method the same before and after.
- Ignoring declined invitations. The invitee list may include people who never attend. Use accepted attendees if your calendar export provides them, and state your choice.
- Claiming all the saving as productive. Freed time does not automatically turn into useful work. Say "time made available" instead of "output gained."
- Measuring too soon. One week is rarely enough. Four weeks is a reasonable minimum for weekly meetings. Monthly meetings need at least two cycles to show anything.
Prepare for the next audit
The results of this check feed the last chapter of the tutorial, where you set a schedule for repeating the audit. Keep the two export files, the survey wording and your decision notes together. Next time you will start with a method that has already been tested, rather than a blank page.
Exercise
Your team cancelled a weekly 45-minute status meeting with 6 attendees, held 48 times a year. Three weeks into the trial, you find that people created a new 20-minute "quick sync" with 4 attendees every week, also 48 times a year. Calculate the annual person-hours saved by the cancellation, the annual person-hours of the new meeting, and the net saving. Then say what other check you would run before deciding to keep the change.
Show answer
The cancelled meeting cost 45/60 × 6 × 48 = 216 person-hours per year. The new meeting costs 20/60 × 4 × 48 = 64 person-hours per year. The net saving is 216 − 64 = 152 person-hours per year. Before keeping the change, check outcomes: whether decisions are still made on time, whether anyone is blocked, and how people rate whether they have the information they need. You should also look at whether the quick sync is growing or attracting more attendees, because it may be a replacement meeting that will erode the saving.
Exercise
A trial saved 120 person-hours per year, but an anonymous survey shows the average score for "I have the information I need" dropped from 4.2 to 3.1 on a five-point scale. Using the interpretation table, what is the reading and what action would you suggest?
Show answer
High time saved with worse outcomes means the cut removed something of real value. Suggest restoring part of the meeting, for example a shorter or less frequent version, or improving the written update that replaced it, and then run a second short trial to check whether the score recovers while most of the saving remains.