Sub topic 12
Designing contracts that align incentives
This chapter assumes you know the principal-agent framing from the previous chapter. It also assumes you can compute an expected value and that you know what a participation decision is (a party accepts a deal only if it beats their next-best option). You do not need calculus.
The design problem
Under moral hazard, the principal cannot observe what the agent does. The principal can only observe outcomes, or other signals that hint at the action. A contract is a rule that maps those observable things to payments. The designer's job is to choose that rule so the agent finds it in their own interest to do what the principal wants.
Nothing in the contract can say "take care". A clause like that is unenforceable if nobody can verify it. The contract can only change what care is worth to the agent, and it does this by tying the agent's payoff to something observable that care makes more likely.
Two constraints every contract must satisfy
A feasible contract meets two conditions.
- Participation constraint. The agent's expected payoff from accepting must be at least what the agent gets elsewhere (the reservation payoff, often normalized to 0). If it is not, the agent refuses the contract.
- Incentive compatibility constraint. Among the actions open to the agent, the one the principal wants must give the agent the highest expected payoff. If it does not, the agent picks another action, whatever the contract's intentions.
The two constraints do different jobs. Participation decides whether the agent signs. Incentive compatibility decides what the agent does after signing. A contract can pass one and fail the other. A flat salary passes participation easily and gives no reason to work hard.
A worked example: a bonus on success
Suppose a manager (the principal) hires a salesperson (the agent). The salesperson can work hard or not. The manager sees only whether a sale closes.
- A closed sale is worth 200 to the manager.
- If the agent works hard, a sale closes with probability 80%. If not, 40%.
- Working hard costs the agent 20 in effort.
- The agent's outside option is 0.
- The agent cannot be paid a negative amount (limited liability), so the payment on failure is 0 and the contract sets a bonus
bpaid on success.
Incentive compatibility requires that the expected bonus gain from working hard covers its cost:
(0.80 − 0.40) × b ≥ 20, so b ≥ 50.
Participation requires 0.80 × b − 20 ≥ 0, so b ≥ 25. The incentive constraint is the binding one: the bonus must be at least 50 to change behavior. The code below finds this by search, using whole percentages so the arithmetic is exact.
# Bonus contract: the agent is paid b if a sale closes and 0 otherwise.
# Probabilities are in percent so that the arithmetic stays exact.
P_HIGH = 80 # percent chance of a sale if the agent works hard
P_LOW = 40 # percent chance of a sale if the agent does not
COST = 20 # agent's cost of working hard
REVENUE = 200 # value of a closed sale to the principal
for b in range(0, REVENUE + 1):
# Agent's expected payoff, multiplied by 100.
payoff_hard = P_HIGH * b - COST * 100
payoff_easy = P_LOW * b
incentive_compatible = payoff_hard >= payoff_easy
participates = payoff_hard >= 0
if incentive_compatible and participates:
profit_with_incentive = P_HIGH * (REVENUE - b) / 100
profit_without = P_LOW * REVENUE / 100 # no bonus, agent does not work hard
print(f"minimum bonus: {b}")
print(f"principal's expected profit with bonus: {profit_with_incentive}")
print(f"principal's expected profit with no bonus: {profit_without}")
breakThe program prints a minimum bonus of 50, a profit of 120.0 with the bonus, and 80.0 without it. The principal pays the agent an expected 40 (0.80 × 50) and still comes out 40 ahead. The agent's expected payoff is 40 − 20 = 20, which is above the outside option of 0. That surplus is called an incentive rent. It exists because the principal cannot pay exactly the 20 of effort cost: a bonus smaller than 50 would stop the agent from working hard. Hidden action therefore costs the principal something even when the contract works.
The same logic in insurance
Insurance contracts are incentive contracts in which the insured is the agent and the insurer is the principal. The insured's "effort" is care, and the outcome is whether a loss happens. The contract terms that tie the insured's payoff to the outcome are the deductible and coinsurance.
- A deductible is a fixed amount the insured pays on each claim before the insurer pays anything.
- Coinsurance is a fixed share of each loss that the insured pays.
In the moral hazard example from earlier in this tutorial, care cuts the accident probability from 30% to 10% and costs 20. With a deductible d, the expected saving from care is (0.30 − 0.10) × d. Incentive compatibility requires 0.20 × d ≥ 20, so d ≥ 100. The same calculation works for coinsurance. Suppose a loss is 500 and the insured bears a share s. Then the saving is 0.20 × s × 500, and care pays only if s ≥ 0.20.
| Instrument | What the payoff depends on | What the principal must observe |
|---|---|---|
| Bonus or commission | Whether a sale or output occurred | The outcome |
| Deductible | Loss size, with a fixed share borne by the insured | That a loss occurred and its size |
| Coinsurance | A fixed fraction of the loss | That a loss occurred and its size |
| Monitoring with penalty | A direct check on the action | The action itself, at some cost |
Pay should follow information
The informativeness principle says that a contract should depend on every observable signal that carries information about the hidden action, and only on those. A signal is informative if it changes the probability that the agent took the wanted action. Three consequences follow.
- Pay should depend on outcomes, but also on other evidence, such as a customer survey or a log of safety checks, if it separates diligent agents from careless ones.
- Pay should filter out outcomes the agent does not control. If an industry-wide boom lifts every firm's sales, rewarding raw sales pays the agent for luck. Comparing the agent to peers (relative performance) removes the shared shock.
- A signal that carries no information about the action adds only noise to the agent's pay, so it should be left out.
Common errors and edge cases
- Rewarding what is measured, not what is wanted. An agent responds to the signal in the contract. If a call center is paid per call handled, calls get shorter, even when long calls are what customers need. When the agent has several tasks and only one is measured, effort moves to the measured task. This is called multitasking distortion.
- Gaming the signal. If the signal can be manipulated more cheaply than the real action can be performed, the agent manipulates it. Fake sales and delayed claims are examples.
- Treating the participation constraint as the only limit. A contract that merely beats the outside option can leave the agent with a reason to shirk. Check incentive compatibility separately.
- Ignoring limited liability. In the bonus example, a penalty of −50 on failure would motivate the agent cheaply, but agents with little wealth cannot pay it, and many legal systems forbid such terms. This is why rewards are usually bonuses rather than fines, and why the agent keeps a rent.
- Noise. Outcomes depend on luck as well as action. The agent in the example is risk neutral, so the bonus costs them nothing in risk. A risk-averse agent would demand extra compensation for bearing the uncertainty. That trade-off is the subject of the next chapter.
Exercise
Use the bonus example from this chapter, but change the cost of working hard to 30 (other numbers unchanged: success probability 80% with effort and 40% without, sale worth 200, outside option 0, no payment on failure). What is the minimum bonus, and does the principal still prefer to induce effort?
Show answer
Incentive compatibility requires (0.80 − 0.40) × b ≥ 30, so b ≥ 75. Participation requires 0.80 × b ≥ 30, so b ≥ 37.5, which is weaker, so the minimum bonus is 75. The principal's expected profit is 0.80 × (200 − 75) = 100. Without a bonus the agent does not work hard, and the profit is 0.40 × 200 = 80. The principal still prefers to induce effort, because 100 > 80.
Exercise
A repair shop is paid by an insurer for each claim it fixes, and the insurer cannot see how much work the repair actually needed. Name one signal the insurer could add to the contract under the informativeness principle, and one way the shop might game it.
Show answer
One signal is the rate at which a repaired item comes back for repeat repair within 90 days, because it carries information about whether the original repair was done properly. The shop could game it by steering returning customers to a different location or business name, so that repeat visits are not recorded against the original repair.