Sub topic 7
Showing Calculations So That Partial Credit Is Possible
This chapter assumes you know the Level III curriculum formulas, such as the Sharpe ratio, the Treynor-Black style active-return measures, and duration-based hedge ratios. It also assumes you have read the earlier chapters on grading principles and command words. Here the focus is how to lay out a calculation on the page so a grader can award every point you have earned.
Why calculations are graded in steps
A constructed-response calculation is rarely worth one point. A question worth 4 points often splits into several scoring components, for example: choose the right formula, enter the right inputs, compute the intermediate value, and reach the final answer. Graders work from a solution key that lists these components. They look for each one in your written work.
Two consequences follow:
- A correct final number with no work usually earns the points. A wrong final number with visible, correct steps often still earns most of them.
- A wrong final number with no work earns nothing, because the grader has nothing to credit.
The second case is the one to avoid. Writing the steps costs a few seconds. It turns an all-or-nothing answer into a graded one.
The four-line calculation layout
Use the same layout every time. It maps onto the scoring components and makes your work easy to scan.
- Formula. Write the formula in words or symbols.
- Inputs. Substitute the numbers from the vignette, with units.
- Computation. Show the arithmetic on one line.
- Answer. State the result, rounded sensibly, with units and a label.
Here is a worked example. A question asks: "Calculate the expected return of the portfolio using the Black-Litterman style adjustment, given a risk-free rate of 2.0%, a beta of 1.2, and an expected market return of 8.0%." A simple CAPM version looks like this:
Formula: E(R) = Rf + Beta x (E(Rm) - Rf)
Inputs: E(R) = 2.0% + 1.2 x (8.0% - 2.0%)
Computation: = 2.0% + 1.2 x 6.0% = 2.0% + 7.2%
Answer: E(R) = 9.2%If you mistyped 1.2 x 6.0 as 6.2 on your calculator, a grader can see that the formula and inputs were correct. You would lose the arithmetic point but keep the others.
Error carried forward
Many Level III problems chain calculations. The output of part (a) becomes an input to part (b). Graders generally apply a principle often called error carried forward (ECF): if you made an error in an earlier part but use your own wrong number correctly in a later part, you can still earn the later credit.
ECF only works if the grader can see what you did. To protect it:
- Label every intermediate result, such as "Portfolio beta = 1.15".
- In the later part, write which earlier value you are using, such as "Using beta from part (a)".
- Do not silently replace your earlier number with a different one in the later part. If you notice the earlier error, correct it clearly and note that you have changed it.
Partial credit and what graders look for
Partial credit depends on visible evidence of each scoring component. The table shows typical components and how to make each one visible.
| Scoring component | What the grader looks for | How to make it visible |
|---|---|---|
| Correct formula | The right relationship, not a similar one | Write the formula before any numbers |
| Correct inputs | Values taken from the vignette, in the right form | Show the substitution line |
| Correct arithmetic | The computation follows from the inputs | Show one line of working |
| Correct final answer | Number matches the key within tolerance | Label it and state units |
| Interpretation (if asked) | A statement of what the number means | Add one sentence after the answer |
Input errors are common. Typical examples are using an annual rate for a quarterly period, using the wrong date's price, and mixing percentage and decimal forms. If the formula is right and one input is wrong, you usually lose only the input and answer points.
A longer example with several steps
Consider a hedging question. A portfolio manager holds a bond portfolio worth 50 million with a modified duration of 6.5. She wants to reduce the duration to 4.0 using futures with a price value per contract of 1,200 and a futures duration of 7.0 per the vignette. Suppose the question asks for the number of contracts. Duration-based futures sizing can be written in terms of target and current duration:
portfolio_value = 50_000_000
current_duration = 6.5
target_duration = 4.0
futures_price = 120_000 # contract value
futures_duration = 7.0
contracts = (target_duration - current_duration) / futures_duration \
* portfolio_value / futures_price
print(round(contracts, 1))The output is -14.9, which rounds to about 15 contracts sold. On paper, the same work looks like this:
Formula: N = (D_target - D_current) / D_futures x (V_portfolio / V_futures)
Inputs: N = (4.0 - 6.5) / 7.0 x (50,000,000 / 120,000)
Computation: = -0.3571 x 416.67 = -148.8 ... check scaleThis is where checking matters. The ratio 50,000,000 / 120,000 equals 416.67, and -0.3571 x 416.67 equals -148.8, not -14.9. The Python snippet above gives -148.8 as well when run, so the "-14.9" quoted earlier was a slip. The correct answer is about 149 contracts sold. Notice what the written layout did: the check line exposed the mismatch between a quick mental estimate and the computed value. Always compare your answer with a rough estimate before moving on.
Answer: Sell approximately 149 futures contractsThe sign matters here. A negative number means a short position, and the answer should say "sell". A bare "-148.8" might lose the interpretation point.
Sanity checks before you move on
Build a five-second check into every calculation:
- Direction. Should the answer be larger or smaller than the inputs suggest? Reducing duration should require selling futures.
- Magnitude. A portfolio beta of 12 or a return of 90% is a signal of a slip.
- Units. Percent versus decimal, annual versus monthly, currency units.
- Sign. Is a negative number meaningful, such as a short position, or an error?
If you find an error late, cross it out neatly and write the corrected line below. Do not overwrite digits so that they become unreadable.
Rounding and precision
Rounding rules are a quiet source of lost points.
- Carry at least four significant figures through intermediate steps, and round only the final answer.
- Match the precision of the vignette. If the inputs are given to one decimal place in percent, an answer to two decimals in percent is usually acceptable.
- Graders typically accept answers within a small tolerance of the key, but a rounded intermediate value that shifts the final answer noticeably can cost the answer point.
For example, rounding 0.3571 to 0.36 before multiplying by 416.67 gives 150.0 instead of 148.8. That is a visible difference. Keep the longer figure.
When you are unsure of the method
Sometimes you cannot recall the exact formula. Do not leave the space blank. Write what you do know:
- Name the concept ("This is a duration-matching problem").
- Write the formula as best you remember it.
- Substitute the vignette values and compute.
- Give a labeled answer.
A partially correct approach can still earn the inputs or concept points. A blank earns none.
Choosing what to show under time pressure
Space and time are limited, so show the work that maps to scoring components and skip the rest. Do not copy the vignette. Do not write long explanations of why a formula works unless the command word asks for it. If the command word is "calculate", the calculation is the answer. If it is "calculate and interpret", add one sentence on meaning.
Common calculation mistakes
- Skipping the formula and showing only numbers.
- Using the wrong period, for example an annual figure where the question needs a quarterly one.
- Leaving a result unlabeled when several values appear on the page.
- Rounding intermediate values early.
- Dropping the sign or the word "buy" or "sell" in a position question.
- Silently changing an earlier answer when reusing it later.
Exercise
A question worth 3 points asks you to calculate a portfolio's Sharpe ratio. The portfolio return is 9.0%, the risk-free rate is 3.0%, and the standard deviation is 12.0%. Write the answer in the four-line layout, and state which scoring components each line protects.
Show answer
Formula: Sharpe ratio = (Rp - Rf) / standard deviation. Inputs: (9.0% - 3.0%) / 12.0%. Computation: 6.0% / 12.0% = 0.50. Answer: Sharpe ratio = 0.50. The formula line protects the method point, the inputs line protects the input-selection point, and the computation and answer lines protect the arithmetic and final answer points. If you had used 9.0% / 12.0% by forgetting the risk-free rate, the written formula would still show the error clearly, and a grader could award the points that remain.
Exercise
In part (a) you calculate a portfolio beta of 1.30, but the official answer is 1.20. In part (b), you use 1.30 correctly in the CAPM formula with Rf = 2.0% and a market return of 8.0%. What should you write to protect possible error-carried-forward credit, and what is your part (b) result?
Show answer
Write "Using beta from part (a) = 1.30" before the formula. Then E(R) = 2.0% + 1.30 x (8.0% - 2.0%) = 2.0% + 7.8% = 9.8%. Labeling the source of the beta lets the grader see that the part (b) method was applied correctly to your own earlier value.