Sub topic 9
Worked cases: warranties, restructuring, onerous contracts, and lawsuits
This chapter applies the recognition and measurement rules to four common provisions. It assumes you know double-entry bookkeeping, the IAS 37 recognition criteria (present obligation, probable outflow, reliable estimate), and basic present value.
Warranties
A warranty obligation arises when the product is sold. The company cannot know which units will fail, so it measures the provision for the whole population using expected value.
units_sold = 1000
# (probability, repair cost per unit) for the warranty population
outcomes = [(0.97, 0), (0.02, 50), (0.01, 300)]
expected_cost_per_unit = sum(p * cost for p, cost in outcomes) # 4.0
warranty_provision = units_sold * expected_cost_per_unit # 4000.0
print(expected_cost_per_unit, warranty_provision)The expense is recognised in the sale year. Later repair costs are charged against the provision, not the income statement.
Sale year: record the warranty provision
Dr Warranty expense 4,000
Cr Warranty provision 4,000
Later: a customer claim is met with a repair costing 50
Dr Warranty provision 50
Cr Cash / Inventory / Wages payable 50Restructuring
A restructuring provision is allowed only when a constructive obligation exists. Under IAS 37, management needs a detailed formal plan and must have raised a valid expectation in those affected, either by starting the plan or by announcing its main features. A board decision alone is not enough.
Include only direct costs of the restructuring, such as redundancy payments. Exclude costs of continuing operations, such as retraining staff who stay or relocating them. Also exclude future operating losses.
Onerous contracts
A contract is onerous when the unavoidable costs of meeting it exceed the economic benefits expected from it. Suppose a company must keep paying rent of 30,000 a year for premises it no longer uses, and it cannot exit the lease or sublet it. The remaining payments are unavoidable, so it provides for them. If it could exit by paying a penalty, it would provide for the lower of the cost of fulfilling the contract and the penalty.
Before booking a provision, test any assets dedicated to the contract for impairment first.
Lawsuits
Legal claims need judgment about whether a present obligation exists. A claim filed against the company is not an obligation until it is probable that the company will lose. Legal advice is the usual evidence.
- If a loss is more likely than not and the amount can be estimated, recognise a provision.
- If a loss is possible but not probable, disclose a contingent liability.
- If a loss is remote, do nothing.
For a single claim, the most likely outcome is often the best estimate. For a lawsuit with a range of outcomes, use judgment about which figure best reflects the obligation.
Summary of the four cases
| Case | Trigger for recognition | Typical measurement |
|---|---|---|
| Warranty | Sale of the product | Expected value across the population |
| Restructuring | Detailed plan plus valid expectation | Direct costs only |
| Onerous contract | Unavoidable costs exceed benefits | Lower of fulfilment cost and exit penalty |
| Lawsuit | Loss more likely than not | Most likely outcome or best estimate |
Exercise
A company sells 2,000 units. Past experience shows 95% need no repair, 4% need a repair costing 40, and 1% need a repair costing 200. What warranty provision should it record, and what is the entry?
Show answer
Expected cost per unit = 0.95 × 0 + 0.04 × 40 + 0.01 × 200 = 1.60 + 2.00 = 3.60. Provision = 2,000 × 3.60 = 7,200. Entry: Dr Warranty expense 7,200; Cr Warranty provision 7,200.
Exercise
In December the board decides to close a factory but has told no one and has no detailed plan. Can it recognise a restructuring provision at year end?
Show answer
No. There is no constructive obligation, because no detailed formal plan exists and no valid expectation has been raised in those affected. The provision cannot be recognised.