Sub topic 6
When to recognise a provision
This chapter assumes you can post double-entry adjusting entries and read a balance sheet. It also assumes you know the accrual basis and basic present value. The chapter covers the recognition test for a provision under IAS 37 and the parallel test under ASC 450. Measurement, discounting and disclosure get their own chapters.
Why recognition is a separate question
The previous chapter separated provisions from accruals. A provision is a liability of uncertain timing or amount. Before you can measure one, you must decide whether it belongs on the balance sheet at all. That decision decides whether an expense hits profit this period. A wrong answer in either direction misstates earnings and liabilities.
Recognition is binary. A provision is either recorded in full at its best estimate, or it is not recorded. Obligations that fail the test may still be disclosed as contingent liabilities. That is the subject of a later chapter.
The three IAS 37 criteria
IAS 37 requires a provision when all three conditions hold:
- The entity has a present obligation (legal or constructive) as a result of a past event.
- An outflow of resources embodying economic benefits is probable.
- A reliable estimate of the amount can be made.
If any one fails, you do not recognise a provision. The tests apply in a sensible order. The first is the hardest to apply and does most of the filtering.
Criterion 1: a present obligation from a past event
The obligation must exist at the reporting date. A future intention to spend money is not an obligation. The past event that creates the obligation is called an obligating event. It leaves the entity no realistic alternative to settling.
An obligation can arise in two ways:
- Legal obligation. It comes from a contract, legislation or other operation of law. A signed warranty on a product already sold is an example.
- Constructive obligation. It comes from the entity's own actions. Through an established pattern of past practice, published policies or a sufficiently specific current statement, the entity has created a valid expectation in others that it will accept certain responsibilities. A retailer that has always refunded returns, and has said so publicly, has a constructive obligation even without a legal duty.
Two points trip people up.
- The obligation is to another party. A board decision to refurbish a factory next year creates no obligation to anyone. You could avoid the cost by changing your mind. So no provision exists.
- Where it is unclear whether an obligation exists, IAS 37 says to treat a past event as giving rise to a present obligation if, taking all available evidence into account, it is more likely than not that a present obligation exists at the reporting date. A lawsuit filed against you is the usual case. You weigh the evidence, often with legal advice, to decide whether you are more likely than not liable.
Criterion 2: probable outflow
Under IAS 37, "probable" means more likely than not, so a probability above 50%. This is a low bar compared with the everyday meaning of the word. An outflow with a 51% chance meets it.
For a large population of similar items, such as warranties, you assess probability across the whole class. The chance of any single claim may be small, but the chance that some outflow occurs across the class is high. That is why a warranty provision can exist when 97% of units never need repair.
Criterion 3: reliable estimate
IAS 37 holds that a reliable estimate can almost always be made, even when the amount is uncertain. You can use a range or an expected value. Only in extremely rare cases is it impossible. In those cases a liability exists but is disclosed as a contingent liability. Do not use "we cannot estimate it" as a routine escape route.
The ASC 450 test
US GAAP uses a loss contingency model. A loss is accrued when both conditions hold:
- It is probable that a liability has been incurred at the date of the financial statements.
- The amount of the loss can be reasonably estimated.
The word "probable" means something different here. ASC 450 defines probable as "likely to occur", which practice treats as a considerably higher threshold than IFRS. Many practitioners put it at around 70–75% or more, though the standard sets no number. A matter that is IFRS-probable at 55% would generally not be accrued under US GAAP.
Two other differences appear at recognition:
- ASC 450 has no separate "constructive obligation" test. It asks whether a loss is probable, based on events that have occurred.
- If a range of loss is estimable and no amount in the range is a better estimate, US GAAP accrues the minimum of the range. IFRS uses the midpoint for a continuous range. A later chapter covers this.
Comparing the thresholds
| Feature | IAS 37 (IFRS) | ASC 450 (US GAAP) |
|---|---|---|
| Obligation test | Present obligation from a past event (legal or constructive) | Liability incurred at the balance sheet date |
| Probability term | Probable = more likely than not (over 50%) | Probable = likely to occur (higher bar) |
| Estimate test | Reliable estimate | Reasonably estimable |
| If probable but not estimable | Contingent liability, disclosed (very rare) | Disclose, no accrual |
| If only possible | Contingent liability, disclose unless remote | Disclose if reasonably possible |
A decision flow
The diagram shows the order in which to apply the tests under IAS 37.
Worked example: a lawsuit and a policy
On 31 December, Brook Ltd has two matters.
Matter 1: a customer lawsuit. A customer sued for 80,000 after a product fault. Lawyers say Brook is more likely than not to lose, and that the likely settlement is 60,000.
- Present obligation: the product was sold before year end, and the evidence suggests liability. Yes.
- Probable outflow: more likely than not. Yes.
- Reliable estimate: 60,000. Yes.
Brook recognises a provision:
Dr Legal expense 60,000
Cr Provision for legal claim 60,000Under US GAAP, the same facts need a "likely" assessment. If counsel puts the chance of loss at only 55%, the company would disclose but not accrue.
Matter 2: a planned factory move. The board approved a relocation in November, to take place in March. Nothing has been announced to staff or anyone else.
- Present obligation: none. No one outside the board has a valid expectation.
Brook records nothing. For restructuring, IAS 37 requires a detailed formal plan and a valid expectation in those affected, for example through announcement. A later chapter on common provisions covers that.
Typical errors
- Provisioning for future operating losses. Losses expected from future trading are not a present obligation. Do not provide for them. The exception is an onerous contract, covered later.
- Provisioning for general risk. "Sundry contingencies" or "cookie jar" reserves have no obligating event. Under IAS 37 they are not allowed.
- Confusing probable with certain. A provision can be recognised on 55% likelihood under IFRS. Waiting for certainty means late recognition.
- Applying IFRS thresholds to US GAAP. A matter that is provision-worthy under IAS 37 may only be a disclosure under ASC 450.
- Using "cannot estimate" too easily. The estimate failure route is extremely rare. A range nearly always gives a usable figure.
- Recognising on intent alone. Management's plan to spend is not an obligation until it has created an external expectation or legal duty.
Checking your understanding
Exercise
At 31 December a company is being sued. Counsel puts the chance of losing at 60% and estimates damages at 200,000. Under IAS 37, is a provision recognised? Under ASC 450, would an accrual normally be recorded? Explain.
Show answer
Under IAS 37, yes. A past event exists, the outflow is probable because 60% is more likely than not, and the 200,000 estimate is reliable, so a provision of 200,000 is recognised (the exact amount follows the measurement rules). Under ASC 450, probable means likely to occur, a higher bar than 60% in practice, so an accrual would normally not be recorded and the matter would be disclosed as a reasonably possible loss. The same facts can give different results because the two probability thresholds differ.
Exercise
A board approves a plan in December to close a division in the following spring. Nothing is announced before the year end. Does IAS 37 allow a restructuring provision at 31 December? Which criterion fails?
Show answer
No. The first criterion fails because there is no present obligation. Without a detailed formal plan announced to those affected, there is no valid expectation, so the entity has not created a constructive obligation. The board can still change its mind without consequence.
Exercise
A company expects to make an operating loss next year and wants to record a provision for it to "smooth" earnings. Why is this not allowed?
Show answer
A future operating loss arises from future events, not from a past obligating event. There is no present obligation at the reporting date, so the first IAS 37 criterion fails. Recording it would also be an earnings-management practice that the standard is designed to prevent.