Sub topic 11
Running a 5S Pilot in a Work Area
This chapter assumes you understand the basic idea of workplace waste and the five 5S steps: Sort, Set in Order, Shine, Standardise and Sustain. A pilot is a small, controlled trial in one work area. It tests the method, makes results visible and reveals problems before the organisation expands the approach.
Choose and prepare the pilot area
Choose an area with a clear process, visible problems and a team that can participate. A production cell, tool crib, maintenance bench or document-processing team can work well. Avoid starting with the entire site. A pilot should be small enough to improve in days or weeks.
Define the area’s boundaries. Record its current condition with photographs, a simple map and baseline measures. Useful measures include:
- Time spent searching for tools or materials
- Number of unnecessary items in the area
- Safety hazards, blocked access or trip risks
- Time needed to clean and inspect the area
- 5S audit score
Appoint a pilot owner who coordinates actions and removes obstacles. Include the people who use the area every day. They know which items are necessary, which storage locations are inconvenient and which rules will fail in practice.
Run the pilot in sequence
Use the five steps as a linked cycle rather than as separate cleaning events.
1. Sort
List every item in the area and ask whether it is needed for current work. Remove obvious rubbish and duplicates. Place uncertain items in a temporary holding location using red tags. A red tag records the item, location, reason for review and proposed disposition.
Set a decision date. Items should be returned, moved to another area, repaired, transferred or discarded according to an agreed process. Do not create a permanent “temporary” pile.
2. Set in Order
Design storage around frequency of use, safety and the work sequence. Keep frequently used items close to the point of use. Store heavy items between knee and shoulder height where possible. Label locations clearly and mark boundaries on floors or shelves.
Use shadow boards for tools, outlines for equipment and minimum-maximum markings for consumables. A visual control should make an abnormal condition obvious without requiring a search or explanation.
3. Shine
Clean the area and equipment, but treat cleaning as inspection. While cleaning, look for leaks, loose fasteners, damaged cables, worn tools and abnormal noise. Record defects and assign owners rather than hiding them through cleaning.
Define what must be cleaned, by whom, how often and to what condition. The routine should fit the work cycle. A five-minute end-of-shift inspection may be more reliable than a large monthly cleanup.
4. Standardise and Sustain
Create a one-point standard for the work area. It can show the correct layout, storage locations, cleaning points, responsible roles and response to abnormalities. Use photographs and short checklists so that a new person can understand the expected condition.
Schedule short audits. Score each 5S element from 0 to 4, record evidence and assign corrective actions with due dates. Review the results with the team. Sustaining 5S means maintaining the agreed condition and improving it when the process changes.
Common pitfalls
- Treating 5S as a one-day cleaning campaign
- Removing items without checking future need or ownership
- Designing storage without observing the actual work
- Adding labels that are unclear, damaged or too numerous
- Making standards that are longer than the work requires
- Auditing people instead of checking conditions and processes
- Ignoring defects discovered during Shine
- Expanding before the pilot team has fixed recurring problems
Exercise
Exercise
A pilot team removes seldom-used fixtures but later discovers that production needs one of them for a monthly changeover. What should the team change in its pilot process?
Show answer
The team should use a red-tag holding area with a defined review period, record the fixture’s owner and frequency of use, and decide its storage location based on the verified changeover requirement rather than discarding it immediately.