Sub topic 12
Common Pitfalls and How to Avoid Them
This chapter assumes you know the five steps (Sort, Set in Order, Shine, Standardise, Sustain), the red-tag process, basic visual controls, and how audits are scored. It covers the ways 5S programmes usually fail and the actions that prevent each failure. Most failures come from a small set of causes, and you can spot them early if you know what to look for.
Why 5S programmes fade
A 5S pilot nearly always looks good in its first month. The area is clean, labels are fresh, and the audit score is high. The real test is month six. A programme that has failed does not collapse on one day. It erodes: a tool left out, a missed cleaning slot, an audit moved to next week. Each lapse is small, and the next lapse is easier.
The pitfalls below are grouped by where they occur in the life of a programme.
Pitfalls at the start
Treating 5S as a clean-up campaign
The most common error is to run 5S as a tidy-up day. Cleaning is visible and easy, so teams stop at Shine and never do the harder work of deciding what belongs in the area (Sort) or where it lives (Set in Order). The area looks better for a week. Nothing in the system prevents the clutter from returning.
How to avoid it:
- State the purpose in terms of the work: less searching, fewer hazards, faster changeovers. Do not state it as "a tidier workplace".
- Measure something before you start, such as the time to find a common tool or the number of items in the area. Measure again after.
- Do the steps in order. Do not label shelves before Sort has removed what should not be on them.
No management support or visible presence
If managers do not walk the area, ask about it, or give time to do it, operators read 5S as optional. Time is the clearest signal. If 5S routines have no time in the schedule, they compete with production and lose.
How to avoid it:
- Give the routines a protected slot, typically 5 to 15 minutes at a fixed point in the shift.
- Have a manager take part in the pilot's red-tag review and in audits.
- Respond to requests. If operators ask for a shadow board or a bin and nothing arrives, they stop asking.
Doing 5S to people instead of with them
A consultant or supervisor who decides what is "needed" without asking the people who use the items will remove things that matter and keep things that do not. Operators then hide items, bring them back, or ignore the new layout.
How to avoid it:
- Put the people who work in the area on the pilot team. They know which tool is used hourly and which is used once a year.
- Let the team make the red-tag decisions, with a named person to resolve disputes.
- Explain the reason for each change. A shadow board is accepted more readily when people can see it saves them a walk.
Pitfalls in Sort and Set in Order
Throwing away too much, or too little
Over-disposal removes items that are used rarely but are essential, such as a spare fixture for a monthly job. Under-disposal keeps everything "just in case", and the area stays full.
A red tag with a clear disposition field helps avoid both. The template from the Sort chapter records why an item was flagged and who decided:
RED TAG
Item: Spare fixture, model B
Location found: Assembly bay 3
Date tagged: ____
Tagged by: ____
Reason: [ ] Not needed [ ] Unknown use [ ] Excess quantity [ ] Defective
Disposition: [ ] Keep here [ ] Move to storage [ ] Transfer [ ] Discard
Decision by: ____ Date: ____Two practices make this work. First, use a holding area for tagged items with a fixed review period, for example 30 days, so that a wrong call can be reversed. Second, set a usage rule up front, such as: used daily means at the point of use, used weekly means in the area, used rarely means in storage.
Labelling before deciding
Teams like labels because they are quick and produce a visible result. If you label locations before Sort is finished, you label homes for items that should not exist, and you relabel later. Worse, the labels give clutter an air of permanence.
Layouts that ignore how the work flows
A location can be tidy and still be wrong. If a frequently used tool lives at the far end of the bench, people will leave it near the point of use, and the "home" will go unused. Place items by frequency of use and by the order of the work, not by appearance or by category alone.
How to check: watch a full work cycle and mark where people reach, walk, and look. Move the homes to match the movement, then watch another cycle.
Visual controls that are inconsistent or decorative
Colours, label formats and floor markings that differ between areas confuse people who move between them. Controls that show no abnormal state, such as a shadow board with no outline, cannot be used to spot a missing item at a glance.
| Weak control | Problem | Stronger control |
|---|---|---|
| Hand-written, varied labels | Hard to read, hard to replace | Standard label format and font |
| Shelf with names only | Missing item is not obvious | Outline or photo of the item |
| Different floor colours per area | Meaning changes between areas | One site colour code, posted |
| Min/max shown only in a file | Nobody sees it at the point of use | Marked line on the bin or rack |
Pitfalls in Shine and Standardise
Cleaning without inspecting
If Shine is only wiping surfaces, you lose its main value. Cleaning is a chance to find leaks, loose guards, wear, and damage before they stop production. A team that cleans without a list of what to look for will not report these findings.
How to avoid it:
- Add inspection points to the cleaning routine, such as "check for oil under the press" and "check guard is secure".
- Provide a way to report findings and a visible record of the action taken.
- Fix causes, not only effects. If the same spot is dirty every day, find the source.
Standards that are too long or never updated
A standard is a short statement of how the area should look and who does what. When it grows into a long document, nobody reads it. When it is not updated after a layout change, it contradicts what people see, and they stop trusting it.
Good standards have these properties:
- One page or one photo per area, showing the target state.
- Named owner and a review date.
- Written in the words and with the pictures operators use.
Standardising a poor method
Standardise should lock in a good arrangement, not any arrangement. If you write a standard straight after a first-pass layout, you fix its flaws. Allow one or two improvement cycles, using operator feedback, before you freeze the standard across areas. A route for suggestions keeps it open to change.
Pitfalls in Sustain and audits
No ownership
If "everyone" is responsible, nobody is. Each zone needs a named owner, and each routine needs a named person and a time. Ownership should appear on the area's board, so that the owner is visible to the team and to visitors.
Audits that become a ritual or a weapon
An audit has two failure modes. In the first, the same friendly person scores the area every month, gives a good mark, and nothing is found. In the second, a score is used to rank and blame teams, so teams manage the score by cleaning before the audit and hiding problems.
The scoring sheet from the Auditing chapter gives each S a score of 0 to 4, for a total out of 20:
5S AUDIT CHECKLIST (score each line 0 to 4)
Sort: Only needed items are in the area
Set in Order: Every item has a labelled home and is in it
Shine: Floors, surfaces and equipment are clean and free of leaks
Standardise: Visual standards and cleaning schedules are posted and current
Sustain: Routines and audits are done on schedule with actions closed
Total: ___ / 20To keep audits useful:
- Rotate auditors, and include people from other areas so they see with fresh eyes.
- Define each score level with an observable description, so two auditors score the same area alike.
- Record actions found at each audit and review the open ones at the next. A score that rises while actions stay open is a warning sign.
- Use the trend and the findings to help the team, not to rank teams against each other.
Counting score instead of results
A high score on a day does not show that 5S is working. Pair the audit with measures tied to the original problem: search time, changeover time, near-miss reports, or the count of items found without a home. If the score is high and these measures are flat, the audit is measuring appearance.
Recognition without follow-through
Early praise helps, but it fades. Lasting engagement comes from seeing that suggestions lead to changes. Close the loop on each request, even if the answer is no, with a reason.
Scaling pitfalls
Starting everywhere at once
Launching in the whole site stretches coaching and management attention, and the first failures spread. A pilot in one area gives a working example, a set of templates, and trained people who can lead the next area.
Copying a template without adapting it
Standards from a machine shop do not suit a warehouse or a lab. Keep the principles and adapt the details, such as hazard colours, usage rules, and routine timing.
A quick diagnostic
When an area is slipping, work through these questions in order:
- Is there a named owner and a protected time slot?
- Does every item have a home that fits the work flow?
- Is the standard current and short enough to use?
- Were the last audit's actions closed?
- Does management visit and respond?
The first "no" is usually the best place to start.
Exercise
A pilot area scored 18/20 in its first audit. Four months later the score is 17/20, but operators report that finding the right fixture takes as long as before the pilot, and three audit actions from the last two audits are still open. What do the facts suggest is wrong, and what two steps would you take first?
Show answer
The score reflects appearance, not results. The area is probably tidy at audit time while the underlying system is weak: homes may not fit the work flow, and Sustain is failing because actions are not being closed. First, watch a full work cycle to see where operators reach for the fixture and move its home to the point of use, with an outline to show when it is missing. Second, assign owners and dates to the three open actions and review them at the start of the next audit. Also add a search-time measure to the audit so that the score is checked against the original problem.
Exercise
Name three ways that running 5S as a one-off event leads to decay, and one change for each that moves it towards a routine.
Show answer
Examples: (1) No time is scheduled, so routines compete with production and lose. Change: protect a fixed slot of 5 to 15 minutes each shift. (2) No named owner, so nobody is accountable. Change: name an owner per zone and show it on the area board. (3) No audit follow-up, so problems are not corrected. Change: rotate auditors and review open actions at each audit.